High Pitched Horn: Installation
- INSTALL HIGH PITCHED HORN ASSEMBLY
- Connect the horn connector.
- Install the horn with the bolt.
Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf)
- INSTALL UPPER RADIATOR SUPPORT SEAL (See INSTALLATION )
Torque: 19 N*m (194 kgf*cm, 14 ft.*lbf)