LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2006 >> Sentra SE-R Spec V >> Repair and Diagnosis >> Transmission >> Manual Transmission >> RS5F70A >> MAINSHAFT And Gears >> Disassembly

MAINSHAFT And Gears: Disassembly

  1. Before disassembly, measure gear end play with a suitable tool. Refer to "GEAR END PLAY ".
    • If end play is not within the specified limit, disassemble and check the parts.
    Fig 1: Measuring Gear End Play Using Feeler Gauge
    G04192548Courtesy of NISSAN MOTOR CO., U.S.A.
  2. Remove snap ring with a suitable tool.
    Fig 2: Removing Snap Ring
    G04192549Courtesy of NISSAN MOTOR CO., U.S.A.
  3. Remove C-ring holder and mainshaft C-ring.
    Fig 3: Removing C-Ring Holder And Mainshaft C-Ring
    G04192550Courtesy of NISSAN MOTOR CO., U.S.A.
  4. Press out mainshaft rear bearing from mainshaft using Tool.
    Fig 4: Pressing Out Mainshaft Rear Bearing From Mainshaft Using Tool
    G04192551Courtesy of NISSAN MOTOR CO., U.S.A.
  5. Remove mainshaft thrust washer.
    Fig 5: Removing Mainshaft Thrust Washer
    G04192552Courtesy of NISSAN MOTOR CO., U.S.A.
  6. Remove snap ring from mainshaft. Then, remove reverse main gear assembly, reverse gear needle bearing, and reverse gear baulk ring.
  7. Place bearing replacer between 5th & reverse synchronizer hub and 5th main gear, and press out both reverse gear bushing and 5th & reverse synchronizer assembly using Tool.
    Fig 6: Pressing Out Both Reverse Gear Bushing And 5th & Reverse Synchronizer Assembly Using Tool
    G04192553Courtesy of NISSAN MOTOR CO., U.S.A.
  8. Remove 5th main gear, 5th gear baulk ring, and 5th gear needle bearing.
  9. Place bearing replacer between 3rd and 4th main gears, and press out both 5th gear bushing and 4th main gear using Tool.
    Fig 7: Pressing Out Both 5th Gear Bushing And 4th Main Gear Using Tool
    G04192554Courtesy of NISSAN MOTOR CO., U.S.A.
  10. Remove mainshaft adjusting shim and spacer.
    Fig 8: Removing Mainshaft Adjusting Shim & Spacer
    G04192555Courtesy of NISSAN MOTOR CO., U.S.A.
  11. Place bearing replacer between 2nd main gear and 1st & 2nd synchronizer hub, and press out both 3rd and 2nd main gears.
  12. Remove 2nd double cone assembly, 2nd gear bushing, and coupling sleeve assembly.
  13. Place bearing replacer on 1st gear front side, and press out all of 2nd gear bushing, 1st & 2nd synchronizer hub, 1st main gear, and 1st double cone using Tool.
    Fig 9: Pressing Out All Of 2nd Gear Bushing, 1st & 2nd Synchronizer Hub, 1st Main Gear And 1st Double Cone
    G04192556Courtesy of NISSAN MOTOR CO., U.S.A.
  14. Remove 1st gear needle bearing.