LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2018 >> CX-9 Signature >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Automatic Transaxle System (Service Information) >> Automatic Transaxle Removal/Installation [GW6A-EL] >> Installation

Automatic Transaxle Removal/Installation [GW6A-EL]: Installation

CAUTION:
  • Verify that the torque converter stud bolts are inserted into the drive plate bolt holes, and install the transaxle installation bolts. Otherwise, the drive plate could be damaged.
  1. Verify that the torque converter stud bolts are inserted into the drive plate bolt holes from the starter installation hole.
    Fig 1: Installing Transaxle Installation Bolts
    G11441032Courtesy of MAZDA MOTORS CORP.
  2. Install the transaxle mounting bolts.
    Fig 2: Transaxle Mounting Bolts
    G11441033Courtesy of MAZDA MOTORS CORP.

    Tightening torque 

    38-52 N.m {3.9-5.3 kgf.m, 29-38 ft.lbf}

  3. Tighten the stud bolts for the transaxle.
    Fig 3: Transaxle Stud Bolts
    G11441034Courtesy of MAZDA MOTORS CORP.
    NOTE:
    • If the No. 4 engine mount bracket nut is loosened, tighten the stud bolts for the transaxle because they may be loosened.

    Tightening torque 

    15-25 N.m {1.6-2.5 kgf.m, 12-18 ft.lbf}

  4. Install the No. 4 engine mount bracket to No. 4 engine mount rubber, and temporarily tighten the installation bolt.
    Fig 4: Installing No. 4 Engine Mount Bracket To No. 4 Engine Mount Rubber
    G11441035Courtesy of MAZDA MOTORS CORP.
  5. Pull up the transaxle using the SSTs, pass the transaxle stud bolts through the No. 4 engine mount bracket, and temporarily tighten the No. 4 engine mount installation nuts.
    Fig 5: Pulling Up Transaxle Using SSTs
    G11441036Courtesy of MAZDA MOTORS CORP.
  6. Install the No. 1 engine mount bracket component and the bracket plate No. 1 to the transaxle, and temporarily tighten the installation bolts.
    Fig 6: Removing Bracket Plate No. 1 And No. 1 Engine Mount Bracket Component From Transaxle
    G11441017Courtesy of MAZDA MOTORS CORP.
  7. Install the front crossmember component and No. 1 engine mount rubber as a single unit. (See FRONT CROSSMEMBER REMOVAL/INSTALLATION .)
  8. Temporarily tighten the No. 1 engine mount rubber installation bolts.
    Fig 7: Installing Front Crossmember Component And No. 1 Engine Mount Rubber Single Unit
    G11436621Courtesy of MAZDA MOTORS CORP.
  9. Align the positions of the No. 4 engine mount bracket installation nuts with the No. 4 engine mount bracket.
    Fig 8: Aligning Alignment Marks On No. 4 Engine Mount Bracket And Nuts
    G11441039Courtesy of MAZDA MOTORS CORP.
  10. Tighten the No. 4 engine mount bracket installation nuts and bolt in the order shown in the figure.
    Fig 9: No. 4 Engine Mount Bracket Installation Nuts And Bolt Tightening Sequence
    G11441040Courtesy of MAZDA MOTORS CORP.
    ENGINE MOUNT BRACKET INSTALLATION NUTS AND BOLT TIGHTENING SEQUENCE

    No. Tightening torque
    1, 2, 3 92-116 N.m {9.4-11 kgf.m, 69-85 ft.lbf}
    4 81-99 N.m {8.3-10 kgf.m, 60-73 ft.lbf}
    No. Tightening Torque
    1, 2, 3 92-116 N.m {9.4-11 kgf.m, 69-85 ft.lbf}
    4 81-99 N.m {8.3-10 kgf.m, 60-73 ft.lbf}
  11. Tighten the No. 1 engine mount bracket component and bracket plate No. 1 installation bolts in the order shown in the figure.
    Fig 10: No. 1 Engine Mount Bracket Component And Bracket Plate No. 1 Installation Bolts Tightening Sequence
    G11436622Courtesy of MAZDA MOTORS CORP.

    Tightening torque 

    131-153 N.m {14-15 kgf.m, 97-112 ft.lbf}

  12. Tighten the No. 1 engine mount rubber installation bolts.
    Fig 11: No. 1 Engine Mount Rubber Installation Bolts With Torque Specifications
    G12244632Courtesy of MAZDA MOTORS CORP.
  13. Remove the SSTs.
  14. Install the cowl panel. (See COWL PANEL REMOVAL/INSTALLATION .)
  15. Install the cowl grille. (See COWL GRILLE REMOVAL/INSTALLATION .)
  16. Install the windshield wiper arm and blade. (See WINDSHIELD WIPER ARM AND BLADE REMOVAL/INSTALLATION .)
  17. Connect the clip shown in the figure to the protector.
    Fig 12: Connecting Vacuum Hose And Fuel Hose Clip
    G11441021Courtesy of MAZDA MOTORS CORP.
  18. Install the bolts and clip shown in the figure.
    Fig 13: Installing Bolts And Clip With Torque Specifications
    G11436864Courtesy of MAZDA MOTORS CORP.
  19. Fix the crankshaft pulley to lock the torque converter against rotation.
    Fig 14: Fixing Crankshaft Pulley
    G11441015Courtesy of MAZDA MOTORS CORP.
    CAUTION:
    • After temporarily tightening the torque converter installation nut uniformly, tighten it to the specified torque.
  20. Tighten the torque converter installation nut.
    NOTE:
    • There are six installation nuts.
    Fig 15: Removing Torque Converter Nuts From Starter Installation Hole
    G11441016Courtesy of MAZDA MOTORS CORP.

    Tightening torque 

    41-54 N.m {4.2-5.5 kgf.m, 31-39 ft.lbf}

  21. Install the blind cover.
    Fig 16: Installing Blind Cover
    G11441014Courtesy of MAZDA MOTORS CORP.
  22. Install the starter. (See Starter Removal/Installation .)
  23. Connect the front drive shaft (RH) to the transaxle. (See FRONT DRIVE SHAFT REMOVAL/INSTALLATION .)
  24. Connect the front drive shaft (LH) to the transaxle. (See FRONT DRIVE SHAFT REMOVAL/INSTALLATION .)
  25. Connect the front stabilizer control links to the front stabilizer. (See FRONT STABILIZER INSTALLATION .)
  26. Connect the front lower arms to the steering knuckles. (See FRONT LOWER ARM REMOVAL/INSTALLATION .)
  27. Connect the tie-rod end ball joints to the steering knuckles. (See STEERING GEAR AND LINKAGE REMOVAL/INSTALLATION .)
  28. Connect the clips securing the brake hose to the front shock absorbers. (See BRAKE HOSE (FRONT) REMOVAL/INSTALLATION .)
  29. Connect the front ABS wheel-speed sensors to the steering knuckles. (See FRONT ABS WHEEL-SPEED SENSOR REMOVAL/INSTALLATION .)
  30. Connect the water hose to the oil cooler. (Automatic Transaxle Replacement) (See Oil Cooler Removal/Installation .)
  31. Connect the oil cooler to the transaxle with the hose connected. (Except Automatic Transaxle Replacement) (See Oil Cooler Removal/Installation .)
  32. Connect the oil pipe component. (With oil cooler No. 2) (See Oil Cooler Removal/Installation .)
    Fig 17: Installing Oil Pipe Component And Bolt With Torque Specifications
    G11441048Courtesy of MAZDA MOTORS CORP.
  33. Connect the oil hose to the transaxle. (With oil cooler No. 2) (See Oil Cooler Removal/Installation .)
    Fig 18: Connecting Oil Hose To Transaxle
    G11441012Courtesy of MAZDA MOTORS CORP.
  34. Install the front under cover No. 1. (See FRONT UNDER COVER NO. 1 REMOVAL/INSTALLATION .)
  35. Install the front under cover No. 2. (See FRONT UNDER COVER NO. 2 REMOVAL/INSTALLATION .)
  36. Install the front tires. (See WHEEL AND TIRE REMOVAL/INSTALLATION .)
  37. Install the intermediate shaft to the steering gear and linkage. (See STEERING WHEEL AND COLUMN REMOVAL/INSTALLATION .)
  38. Install the joint cover. (See STEERING WHEEL AND COLUMN REMOVAL/INSTALLATION .)
  39. Connect the breather hose to the transaxle.
    Fig 19: Locating Breather Hose To Transaxle
    G11441011Courtesy of MAZDA MOTORS CORP.
  40. Install the selector cable bracket.
    Fig 20: Installing Selector Cable Bracket With Torque Specifications
    G11441051Courtesy of MAZDA MOTORS CORP.
  41. Connect the selector cable to the transaxle. (See AUTOMATIC TRANSAXLE SHIFT MECHANISM REMOVAL/INSTALLATION .)
  42. Connect the ground cable as shown in the figure.
    Fig 21: Installing Ground Cable With Torque Specifications
    G11441053Courtesy of MAZDA MOTORS CORP.
  43. Connect the control valve body connector.
    CAUTION:
    • Make sure that your hand does not touch the terminal as the connector terminal could be damaged.
    • Verify that there is no fluid or foreign matter adhering to the connector before connecting the connector.
    • Insert the connector straight as the connector terminal could be damaged.
    • Rotate the connector lever until a click is heard.
    Fig 22: Disconnecting Control Valve Body Connector
    G11441007Courtesy of MAZDA MOTORS CORP.
  44. Install the front splash shield. (See FRONT SPLASH SHIELD REMOVAL/INSTALLATION .)
  45. Install the water pipe bracket installation bolts.
    Fig 23: Installing Water Pipe Bracket Bolts With Torque Specifications
    G11441055Courtesy of MAZDA MOTORS CORP.
  46. Install the turbocharger air outlet pipe component installation nuts.
    Fig 24: Installing Turbocharger Air Outlet Pipe Component Installation Nuts With Torque Specifications
    G11441056Courtesy of MAZDA MOTORS CORP.
  47. Install the wiring harness with the bracket to the transaxle.
    Fig 25: Installing Wiring Harness With Bracket To Transaxle With Torque Specifications
    G11441057Courtesy of MAZDA MOTORS CORP.
  48. Install the battery and battery tray. (See BATTERY REMOVAL/INSTALLATION .)
  49. Install the air cleaner, air hose and fresh air duct as a single unit. (See Intake-Air System Removal/Installation .)
  50. Connect the negative battery terminal. (See NEGATIVE BATTERY TERMINAL DISCONNECTION/CONNECTION .)
  51. Refill the engine coolant. (See Engine Coolant Replacement .)
  52. Add the ATF. (See Automatic Transaxle Fluid (ATF) Replacement .)
  53. Perform the "TCM configuration" (Automatic transaxle replacement). (See TCM Configuration .)
  54. Perform the "Initial Learning" (automatic transaxle replacement). (See Initial Learning .)
  55. Perform the "Mechanical System Test". (See Mechanical System Test .)