Purge Control Valve No. 1 Test
Blow through purge control valve from port "A". Verify air does not flow. See Figure . Connect vacuum pump to purge control valve. Apply 4.33 in. Hg. Blow through port "A" and verify air does flow.
Blow through purge control valve from port "A". Verify air does not flow. See Figure . Connect vacuum pump to purge control valve. Apply 4.33 in. Hg. Blow through port "A" and verify air does flow.