Inspection Procedure
HINT:
Read freeze frame data using the hand-held tester or the OBD II scan tool. Freeze frame data records the engine conditions when a malfunction is detected. When troubleshooting, freeze frame data can help determine if the vehicle was running or stopped, if the engine was warmed up or not, if the air-fuel ratio was lean or rich, as well as other data from the time when a malfunction occurred.
- Check ETCS fuse.
PREPARATION:
Remove the ETCS fuse from the engine room No. 1 R/B.
CHECK:
Check the continuity of the ETCS fuse.
OK:
Continuity
- NG: Check for short in all harness and components connected to ETCS fuse.
- OK: Go to next step
- Check voltage between terminal +BM of ECM connector and body ground.
PREPARATION:
Remove the engine room ECU cover (See ENGINE CONTROL MODULE (ECM) ).
CHECK:
Measure the voltage between terminal +BM of the ECM connector and body ground.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK:
Voltage: 9 to 14 V
- OK: Check for intermittent problems (See PRE-CHECK ).
- NG: Go to next step
- Check for open and short in harness and connector between battery and ETCS fuse, ETCS fuse and ECM (See HOW TO USE THE DIAGNOSTIC CHART AND INSPECTION PROCEDURE
).
- NG: Repair or replace harness or connector.
- OK: Go to next step
Check engine room No. 1 R/B.