Power Circuit Inspection
■ Circuit Open Inspection
- Ignition off & Engine off.
- Disconnected "ATM solenoid valve" connector and PCM/TCM connector.
- Measure resistance between power of ATM solenoid valve connector and power of PCM/TCM connector.
Specification: Approx. 0 Ω
- Is the measured resistance within specification?
YES
- Go to "Circuit short Inspection" procedure.
NO
- Check circuit open of power and go to "VERIFICATION VEHICLE REPAIR " procedure.
■ Circuit Short Inspection
- Ignition off & Engine off.
- Disconnected "ATM solenoid valve" connector and PCM/TCM connector.
- Measure a resistance between power of ATM solenoid valve connector and chassis ground.
Specification: Infinite
- Is the measured resistance within specifications?
YES
- Substitute with a known-good PCM/TCM and check for proper operation. If the problem is corrected, replace PCM/TCM and then go to "Verification Of Vehicle Repair " procedure.
NO
- Check harness for circuit short. Repair as necessary and go to "VERIFICATION VEHICLE REPAIR " procedure.