LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2009 >> Commander Limited, 4.7 P, 4WD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 3 (5.7L Engine (Service Information)) >> Valve Timing >> COVER(S), Engine Timing >> Installation >> Installation

COVER(S), Engine Timing: Installation: Installation

WARNING: This page is about a different variant/trim than selected.
Fig 1: Front Cover Slide Bushings
GC0081770Courtesy of CHRYSLER LLC
  1. Clean timing chain cover and block surface.
    NOTE: Always install a new gasket on timing cover.
  2. Verify that the slide bushings (1) are installed in timing cover.
  3. Install cover and new gasket. Tighten fasteners to 28 N.m (250 in. lbs.).
    NOTE: The large lifting stud is tightened to 55 N.m (40 ft. lbs.).
    Fig 2: Oil Pan Bolt Tightening Sequence
    GC0082910Courtesy of CHRYSLER LLC
  4. Install the oil pan and pick up tube. See Installation  .
  5. Install the A/C compressor.
  6. Install the generator.
  7. Install power steering pump.
  8. Install the dipstick support bolt.
  9. Install the thermostat housing.
  10. Install crankshaft damper. See Installation  .
  11. Install accessory drive belt tensioner assembly and both idler pulleys.
  12. Install radiator lower hose.
  13. Install both heater hoses.
  14. Install the cooling module.
  15. Install the accessory drive belt.
  16. Install the coolant bottle and washer bottle.
  17. Install the upper radiator hose.
  18. Install the air cleaner assembly.
  19. Fill cooling system.
  20. Refill engine oil.
  21. Connect the battery negative cable.