4.7L Engine (Service Information): Installation: Installation
- Position engine in the vehicle.
- Remove jack from under the transmission.
- Remove Engine Lifting Fixture 10101 (1).
- Position both the left and right side engine mount brackets and install the through bolts (3) and nuts. Tighten to 95 N.m (70 ft. lbs.)
- Install transmission to bellhousing bolts (3). Tighten the bolts to 41 N.m (30 ft. lbs.).
- Install torque converter bolts (3).
- Connect right (3) side body ground strap.
- Connect left (2) side body ground straps.
- Install intake manifold.
- Position generator wiring behind the oil dipstick tube, then install the oil dipstick tube upper mounting bolt.
- Install power steering pump.
- Position and install heater hoses (1) and tubes onto intake manifold.
- Install the heater hoses onto the heater core and the engine front cover, and install clips (2).
- Install generator (3). Refer to Electrical - Engine Systems/Charging/GENERATOR - Installation .
- Install A/C condenser and transmission oil cooler. Refer to Heating and Air Conditioning/Plumbing/CONDENSER, A/C - Installation and Cooling/Engine/RADIATOR, Engine Cooling - Installation .
- Connect radiator upper and lower hoses.
- Connect the transmission oil cooler lines to the radiator.
- Install accessory drive belt. Refer to Cooling/Accessory Drive/BELT, Serpentine - Installation and Cooling/Engine/DRIVE, Fan - Installation .
- Install A/C compressor (2). Refer to Heating and Air Conditioning/Plumbing/COMPRESSOR, A/C - Installation .
- Install throttle body resonator assembly and air inlet hose. Tighten clamps 4 N.m (35 in. lbs.).
- Raise vehicle.
- Connect crankshaft position sensor (1).
- Install starter (4). Refer to Electrical - Engine Systems/Starting/STARTER - Installation
.
CAUTION: The structural cover requires a specific torque sequence. Failure to follow this sequence may cause severe damage to the cover.
- Install structural cover. See Engine/Engine Block/COVER, Structural Dust - Installation .
- Install exhaust crossover pipe.
- Install engine block heater power cable, If equipped.
- Install the strut tower support (1).
- Check and fill engine oil.
- Recharge the A/C system. Refer to Heating and Air Conditioning/Plumbing - Standard Procedure .
- Refill the engine cooling system. Refer to Cooling - Standard Procedure .
- Connect the battery positive and negative cables.
- Start the engine and check for leaks.