LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2009 >> Commander Limited, 4.7 P, 4WD >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 4.7L Engine (Service Information) >> Installation >> Installation

4.7L Engine (Service Information): Installation: Installation

Fig 1: ENGINE LIFT FIXTURE 10101
GC0083571Courtesy of CHRYSLER LLC
  1. Position engine in the vehicle.
  2. Remove jack from under the transmission.
  3. Remove Engine Lifting Fixture 10101 (1).
    Fig 2: ENGINE MOUNT BOLT
    GC0118677Courtesy of CHRYSLER LLC
  4. Position both the left and right side engine mount brackets and install the through bolts (3) and nuts. Tighten to 95 N.m (70 ft. lbs.)
    Fig 3: Remove/Install Transmission to Engine Bolts
    GC0118678Courtesy of CHRYSLER LLC
  5. Install transmission to bellhousing bolts (3). Tighten the bolts to 41 N.m (30 ft. lbs.).
    Fig 4: Remove/Install Torque Converter Bolts
    GC0118679Courtesy of CHRYSLER LLC
  6. Install torque converter bolts (3).
    Fig 5: Body Ground Strap
    GC0082828Courtesy of CHRYSLER LLC
  7. Connect right (3) side body ground strap.
    Fig 6: Body Ground Strap-Left Side Removal / Installation
    GC0082829Courtesy of CHRYSLER LLC
  8. Connect left (2) side body ground straps.
  9. Install intake manifold.
  10. Position generator wiring behind the oil dipstick tube, then install the oil dipstick tube upper mounting bolt.
  11. Install power steering pump.
  12. Position and install heater hoses (1) and tubes onto intake manifold.
  13. Install the heater hoses onto the heater core and the engine front cover, and install clips (2).
    Fig 7: Generator Removal/Installation
    GC0082826Courtesy of CHRYSLER LLC
  14. Install generator (3). Refer to Electrical - Engine Systems/Charging/GENERATOR - Installation .
  15. Install A/C condenser and transmission oil cooler. Refer to Heating and Air Conditioning/Plumbing/CONDENSER, A/C - Installation and Cooling/Engine/RADIATOR, Engine Cooling - Installation .
  16. Connect radiator upper and lower hoses.
  17. Connect the transmission oil cooler lines to the radiator.
  18. Install accessory drive belt. Refer to Cooling/Accessory Drive/BELT, Serpentine - Installation and Cooling/Engine/DRIVE, Fan - Installation .
    Fig 8: A/C Compressor Removal/Installation
    GC0082825Courtesy of CHRYSLER LLC
  19. Install A/C compressor (2). Refer to Heating and Air Conditioning/Plumbing/COMPRESSOR, A/C - Installation .
  20. Install throttle body resonator assembly and air inlet hose. Tighten clamps 4 N.m (35 in. lbs.).
  21. Raise vehicle.
    Fig 9: Crankshaft Position Sensor Removal/Installation
    GC0104644Courtesy of CHRYSLER LLC
  22. Connect crankshaft position sensor (1).
    Fig 10: STARTER REMOVAL/INSTALLATION - 3.7L/4.7L - AUTOMATIC TRANSMISSION
    GC0083515Courtesy of CHRYSLER LLC
  23. Install starter (4). Refer to Electrical - Engine Systems/Starting/STARTER - Installation .
    Fig 11: Structural Cover
    GC0092017Courtesy of CHRYSLER LLC
    CAUTION: The structural cover requires a specific torque sequence. Failure to follow this sequence may cause severe damage to the cover.
  24. Install structural cover. See Engine/Engine Block/COVER, Structural Dust - Installation .
  25. Install exhaust crossover pipe.
  26. Install engine block heater power cable, If equipped.
    Fig 12: STRUT TOWER SUPPORT
    GC0118652Courtesy of CHRYSLER LLC
  27. Install the strut tower support (1).
  28. Check and fill engine oil.
  29. Recharge the A/C system. Refer to Heating and Air Conditioning/Plumbing - Standard Procedure .
  30. Refill the engine cooling system. Refer to Cooling - Standard Procedure .
  31. Connect the battery positive and negative cables.
  32. Start the engine and check for leaks.