LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2009 >> Commander Limited, 4.7 P, 4WD >> Repair and Diagnosis >> Electrical >> Body Electrical >> Power Distribution >> OUTLET, Power, 115 V >> Installation >> Installation

OUTLET, Power, 115 V: Installation: Installation

Fig 1: Rear Heated Seat Switches & Auxiliary Jacks
GC0085470Courtesy of CHRYSLER LLC
  1. Install the 2nd row heated seat switch assembly into the floor console rear trim panel. Push the switch firmly into the trim panel until the retaining tabs are fully seated.
  2. If equipped, connect the 2nd row heated seat switches (1), 115 Volt power outlet (3) and the auxiliary audio jacks (2) electrical connectors to the floor console rear trim panel.
    Fig 2: View Of Center Floor Console Rear Trim Panel
    GC0085469Courtesy of CHRYSLER LLC
  3. Align the trim panel (3) to the console and insert the bottom tabs into the mounting slots.
  4. Tilt the upper edge of the trim panel (1) forward and apply hand pressure to seat all retaining clips.
  5. Connect the battery negative cable.
  6. Verify 2nd row heated seat system operation.