Injector Base Removal and Installation: Installation
- Install the front injector base (A) and rear injector base (B) with new gaskets (C), and torque the bolts/nuts (D) in a crisscross pattern in three steps, beginning with the inner nuts.NOTE: The front injector base gasket is different from the rear one. Do not mix injector base gasket types.
- Install the knock sensor connector (A) and harness bracket mount bolt (B).
- Install the injectors (see INJECTOR REPLACEMENT ).
- Install the intake mainfold (see Removal ).
- Install the P/S pump and P/S hose bracket (see 27 under CYLINDER HEAD INSTALLATION )
- Inspect for fuel leaks. Turn the ignition switch ON (II) (do not operate the starter) so the fuel pump runs about 2 seconds and pressurizes the fuel line. Repeat this operation three times, then check for fuel leakage at any point in the fuel line.
Fig 1: Installing Front Injector Base And Rear Injector Base With New Gaskets, And Torquing Bolts/Nuts In Crisscross Pattern