LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 1982 >> Courier 2.3L Eng VIN 2, Automatic Trans >> Repair and Diagnosis >> Engine Performance >> Specifications >> HITACHI DCS 328 2-Barrel >> Overhaul >> Reassembly

HITACHI DCS 328 2-Barrel: Overhaul: Reassembly

  1. Reassemble carburetor in reverse order of disassembly. Make sure that primary and secondary components are installed in their correct locations.
  2. When installing throttle valve or choke valve, make sure to eliminate gap between valve and wall of carburetor. When assembling float, ensure float collar is installed.
    CARBURETOR ADJUSTMENT SPECIFICATIONS

    Application Float Level In. (mm) Fast Idle Adjustment In. (mm) Choke Valve In. (mm) Choke Diaphragm In. (mm) Choke Unloader In. (mm)
    Courier 2.3L Eng.          
    Calif. .236 (6.0) .061-.071 (1.6-1.8) .041-.067 (1.1-1.7) .063-.079 (1.6-2.0) .094-.126 (2.4-3.2)
    Federal .236 (6.0) .058-.066 (1.5-1.7) .039-.051 (1.0-1.3) .051-.071 (1.3-1.8) .090-.110 (2.3-2.8)