LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2019 >> ProMaster 2500 >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Cooling System >> Engine >> Bottle, Pressurized Coolant >> Installation >> Gas

Bottle, Pressurized Coolant: Installation: Gas

GC0157472Courtesy of CHRYSLER GROUP, LLC
  1. Install the lower coolant hose (4) and tighten the clamp (5).
  2. Install the pressurized coolant bottle (3) and tighten the bolt (6) to 24 N.m (18 ft. lbs.).
  3. Install the coolant return hose (1).
  4. Fill the cooling system. Refer to COOLANT SYSTEM AIR EVACUATION .