LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2011 >> Durango R/T, AWD >> Repair and Diagnosis >> Engine Performance >> System >> DTCS P0580 To P1573 >> Diagnosis And Testing >> P0685-Auto Shutdown Relay Control Circuit >> Diagnostic Test

Diagnostic Test

  1. ASD RELAY OPERATION 
    1. Ignition on, engine not running.
    2. With the scan tool, select View DTCs.

      Is the DTC Active at this time?

      Yes 

      • Go To  2.

      No 

  2. (A209) FUSED B+ CIRCUITS 
    Fig 1: Checking For Open Or Short To Ground In Fused B+ Circuits
    GC0149080Courtesy of CHRYSLER LLC
    1. Turn the ignition off.
    2. Remove the ASD Relay from the TIPM. Refer to RELAY, AUTO SHUT DOWN, REMOVAL .
    3. Using a 12-volt test light connected to ground, probe the (A209) Fused B+ circuits in the TIPM.
      NOTE:

      The test light should be illuminated and bright. Compare the brightness to that of a direct connection to the battery.

      Does the test light illuminate brightly?

      Yes 

      • Go To  3.

      No 

  3. ASD RELAY 
    1. Measure the resistance of the ASD Relay Coil.

      Is the resistance between 60 to 80 Ohms?

      Yes 

      • Go To  4.

      No 

  4. (K51) ASD RELAY CONTROL CIRCUIT OPEN 
    Fig 2: Checking ASD Relay Control Circuit For An Open
    GC0149081Courtesy of CHRYSLER LLC
    1. Disconnect the C3 PCM harness connector.
      CAUTION:

      Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install the PCM Pinout Box (special tool #8815A, Kit, NGC, 38 Position) to perform diagnosis.

    2. Measure the resistance of the (K51) ASD Relay Control circuit from the TIPM to the appropriate terminals of PCM Pinout Box (special tool #8815A, Kit, NGC, 38 Position).

      Is the resistance below 5.0 Ohms?

      Yes 

      • Go To  5.

      No 

  5. (K51) ASD RELAY CONTROL CIRCUIT SHORTED TO GROUND 
    Fig 3: Checking ASD Relay Control Circuit For Short To Ground
    GC0149082Courtesy of CHRYSLER LLC
    1. Measure the resistance between ground and the (K51) ASD Relay Control circuit in the TIPM.

      Is the resistance below 100 Ohms?

      Yes 

      • Repair the short to ground in the (K51) ASD Relay Control circuit.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .

      No 

      • Go To  6.
  6. POWERTRAIN CONTROL MODULE (PCM) 
    1. Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the ASD Relay and the Powertrain Control Module (PCM).
    2. Look for any chafed, pierced, pinched or partially broken wires.
    3. Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal contact in the ASD Relay and Powertrain Control Module connectors.
    4. Perform any Technical Service Bulletins that may apply.

      Were there any problems found?

      Yes 

      No