LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 1996 >> RAM 3500 Van V8-360 5.9L Magnum >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Data Link Connector >> Testing and Inspection

Data Link Connector: Testing and Inspection

- The grounding point for circuit Z12 is the rear of the engine.
- Circuit Z12 also supplies a ground for the PCM high current drivers.
- If the system loses ground for the Z12 circuits at the rear of the engine, the vehicle will not operate. Check the connection at the ganged-ground circuit eyelet.