TEST 61B - Testing Body Controller For No Response
NOTE:
For connector terminal identification, see CONNECTOR IDENTIFICATION. For wiring diagrams, see appropriate chassis wiring diagram in the WIRING DIAGRAMS Section.
- Turn ignition switch to OFF position. Put DRB-II in voltmeter mode. Probe terminal No. 8 (Pink wire) at body controller Black connector. If voltage is more than 10 volts, replace body controller (if not already replaced). Perform VERIFICATION TEST 6A. If voltage is less than 10 volts, remove fuse No. 26 from fuse block.
- Inspect fuse. If fuse is okay, go to step 4). If fuse is blown, put DRB-II in ohmmeter mode. Ensure all doors are closed and disconnect underhood light (if equipped). Probe output terminal (at fuse block) from fuse No. 26. If resistance is less than 5 ohms, repair short to ground in Pink wire. Perform VERIFICATION TEST 6A.
- If resistance is more than 5 ohms, reconnect body controller Black connector. Probe output terminal (at fuse block) from fuse No. 26. If resistance is less than 5 ohms, replace body controller. Perform VERIFICATION TEST 6A. If resistance is more than 5 ohms, replace fuse No. 26. Perform VERIFICATION TEST 6A.
- If fuse is okay in step 2), put DRB-II in voltmeter mode. Probe input terminal to fuse No. 26. If voltage is more than 10 volts, repair open in Pink wire between fuse block and body controller Black connector. Perform VERIFICATION TEST 6A.
- If voltage is less than 10 volts, remove mini-fuse No. 46 at power distribution center. Inspect fuse. If fuse is blown, repair short to ground in Red wire between power distribution center and fuse block. Perform VERIFICATION TEST 6A.
- If fuse is okay, probe input terminal (at power distribution center) to fuse No. 46. If voltage is more than 10 volts, repair open in Red wire between power distribution center and fuse block. Perform VERIFICATION TEST 6A. If voltage is less than 10 volts, repair or replace power distribution center. Perform VERIFICATION TEST 6A.