Installation Procedure
- If replacing the evaporative emissions pipe with a new pipe and the new pipe does not have a sleeve (1) on it, transfer the sleeve (1) from the old pipe to the new one.
- Install the evaporative emission pipe (2) to the vehicle.
- Install Evaporative Emission Pipe (2) @ Retainer (1) (Qty: 5)
- Close the 5 retainers (1).
- Install the left side fuel tank strap. Refer to Fuel Tank Replacement .
- Remove all EN-6015 plugs from the connections.
- Connect Evaporative Emission Pipe (1) @ Evaporative Emission Canister (2). Refer to Plastic Collar Quick Connect Fitting Service
- Install Evaporative Emission Pipe (1) @ Retainer (3)
- Close the retainer (3).
- Install Floor Panel Number 4 Cross Bar. Refer to Floor Panel Number 4 Cross Bar Replacement
- Install Drive Motor Battery. Refer to Drive Motor Battery Replacement and Shipping Preparation
- Install Evaporative Emission Pipe (2) @ Retainers (1) (Qty: 2)
- Close the 2 retainers (1).
- Install Drivetrain and Front Suspension Cradle. Refer to Drivetrain and Front Suspension Cradle Installation
- Lower the vehicle.
- Install Evaporative Emission Pipe (1) @ Retainer (2)
- Close the retainer (2).
- Remove all EN-6015 plugs from the connections.
- Connect Evaporative Emission Pipe (1) @ Evaporative Emission Canister Purge Solenoid Valve (3). Refer to Plastic Collar Quick Connect Fitting Service
- Install Air Cleaner Outlet Duct. Refer to Air Cleaner Outlet Duct Replacement
- Connect Battery Negative Cable. Refer to Battery Negative Cable Disconnection and Connection