LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2012 >> Cruze LS, Standard Trans >> Repair and Diagnosis >> Body & Frame >> Mirrors >> Mirror System >> Diagnostic Information and Procedures >> Heated Mirrors Malfunction >> Circuit/System Testing

Circuit/System Testing

  1. Ignition OFF and all vehicle systems OFF, disconnect the harness connector at the appropriate A9 outside rearview mirror. It may take up to 2 minutes for all vehicle systems to power down.
  2. Test for less than 10 Ω between the ground circuit terminal G and ground.
    • If 10 Ω or greater 
    1. Ignition OFF.
    2. Test for less than 2 Ω in the ground circuit end to end.
      • If 2 Ω or greater, repair the open/high resistance in the circuit.
      • If less than 2 Ω, repair the open/high resistance in the ground connection.
    • If less than 10 Ω 
  3. Connect a test lamp between the control circuit terminal F and ground.
  4. Engine running.
  5. Verify the test lamp turns ON and OFF when operating the rear window defogger switch ON and OFF.
    • If the lamp is always ON 
    1. Ignition OFF, disconnect the harness connector at X50A fuse block - underhood, ignition ON.
    2. Test for less than 1 V between the control circuit and ground.
      • If 1 V or greater, repair the short to voltage on the circuit.
    • If the lamp is always OFF 
    1. Ignition OFF, disconnect the harness connector at X50A fuse block - underhood, ignition ON.
    2. Test for infinite resistance between the control circuit and ground.
      • If less than infinite resistance, repair the short to ground on the circuit.
      • If infinite resistance
    3. Test for less than 2 Ω in the control circuit end to end.
      • If 2 Ω or greater, repair the open/high resistance in the circuit.
    • If the lamp turns on and off 
  6. Test or replace the E17 outside rearview mirror glass.