A/T Shift Lock Control Solenoid (Floor Shift): Installation
- Install the upper clip of the A/T shift lock control solenoid onto the upper pivot point, and the lower clip onto the lower pivot point. See Fig 2 .
- Install the floor console. See FLOOR CONSOLE .
- Install the electrical connector to the A/T shift lock control solenoid. See Fig 1 .
- Connect the negative battery cable.