Secondary Air Injection Solenoid Valve 2, Checking
Special tools and workshop equipment required
- Multimeter.
- Wiring diagram.
Test requirements
- The Secondary Air Injection (AIR) Solenoid Valve 2 -N320- fuse OK.
- The Engine Component Power Supply Relay -J757- fuse OK.
- Battery voltage at least 12.5 V.
- All electrical consumers switched off (radiator fan must NOT run during test).
- A/C switched OFF.
- The ignition switched OFF.
Test procedure
-- Perform a preliminary check to verify the customers complaint. Refer to PRELIMINARY CHECK .
Start diagnosis
-- Remove the engine covers. Refer to the appropriate Service Information.
-- Disconnect the Secondary Air Injection (AIR) Solenoid Valve 2 -N320- electrical harness connector -3-.
Checking internal resistance
-- Using a Multimeter, check the Secondary Air Injection (AIR) Solenoid Valve 2 -N320- terminals 1 to 2 for resistance.
Specified value: 25 to 35 Ω (at Approx. 20° C).
If the specified value was Not obtained:
-- Replace the Secondary Air Injection (AIR) Solenoid Valve 2 -N320- : Refer to appropriate Service Information.
-- Go to Final procedures.
If the specified value was obtained:
Checking voltage supply
Switch the ignition ON.
-- Using a Multimeter, check the Secondary Air Injection (AIR) Solenoid Valve 2 -N320- electrical connector terminal 1 to Ground (GND) for voltage.
Specified value: Battery voltage.
Switch the ignition OFF.
If the specified value was Not obtained:
-- Check the wiring from the Secondary Air Injection (AIR) Solenoid Valve 2 -N320- electrical connector terminal 1 to Fuse SA16 (on fuse panel A) for an open or short circuit.
-- Check the electrical harness connector for damage, corrosion, loose or broken terminals.
-- If necessary, repair the faulty wiring connection.
-- Repair the circuit and replace any open fuses.
-- Go to Final procedures.
If the specified value was obtained:
Checking wiring
-- Remove the Engine Control Module -J623-. Refer to appropriate Service Information. Using a Multimeter, check the Secondary Air Injection (AIR) Solenoid Valve 2 -N320- electrical harness connector terminal 2 to the Engine Control Module -J623- electrical harness connector T94 terminal 28 for an open circuit.
| Secondary Air Injection (AIR) Solenoid Valve 2 -N320- electrical harness connector terminal: | Engine Control Module -J623- electrical connector T94 terminal: |
|---|---|
| 2 | 28 |
Specified value: 1.5 Ω Max.
If the specified value was obtained:
-- Check the wiring for an open circuit.
-- Check the electrical harness connector for damage, corrosion, lose or broken terminals.
-- If necessary, repair the faulty wiring connection.
-- Go to Final procedures.
If the specified value was obtained:
-- Replace the Engine Control Module -J623-. Refer to appropriate Service Information.
Final procedures
-- Reinstall the engine covers, if necessary. Refer to the appropriate Service Information.
-- After the repair work, the following work steps must be performed in the following sequence:
- Check the DTC memory. Refer to DIAGNOSTIC MODE 03 - READ DTC MEMORY .
- If necessary, erase the DTC memory. Refer to DIAGNOSTIC MODE 04 - ERASE DTC MEMORY .
- If the DTC memory was erased, generate readiness code. Refer to READINESS CODE .