Evaporative Purge Regulator Valve, Checking
Observe all safety precautions: SAFETY PRECAUTIONS
View clean working conditions: CLEAN WORKING CONDITIONS
Use only gold-plated terminals when servicing any component with gold-plated electrical harness connector terminals.
For wiring diagrams, component locations, and connector views, Refer to the appropriate System Wiring Diagram.
Special tools and workshop equipment required
- Multimeter
- Wiring diagram.
Test requirements
- The Evaporative Emission (EVAP) Canister Purge Regulator Valve -N80- fuse OK.
- The ignition switched OFF.
Voltage for the Evaporative Emission (EVAP) Canister Purge Regulator Valve -N80- is supplied via the Engine Component Power Supply Relay -J757-.
Test procedure
-- Perform a preliminary check to verify the customers complaint. Refer to PRELIMINARY CHECK .
Start diagnosis
-- Remove the engine covers. Refer to the appropriate Service Information.
-- Disconnect the Evaporative Emission (EVAP) Canister Purge Regulator Valve -N80- electrical harness connector.
Checking internal resistance
-- Using a Multimeter, check the Evaporative Emission (EVAP) Canister Purge Regulator Valve -N80- terminals 1 and 2 for resistance.
Specified value: 17.0 to 25.0 Ω.
If the specified value was Not obtained:
-- Replace the Evaporative Emission (EVAP) Canister Purge Regulator Valve -N80-. Refer to the appropriate Service Information.
-- Go to Final procedures.
If the specified value was obtained:
Checking voltage supply
-- Using a Multimeter, check the Evaporative Emission (EVAP) Canister Purge Regulator Valve -N80- electrical harness connector terminal 1 to Ground (GND).
| Evaporative Emission (EVAP) Canister Purge Regulator Valve - N80- electrical harness connector terminal: | Measure to |
|---|---|
| 1 | Engine Ground (GND) |
-- Start the Engine.
Specified value: battery voltage.
-- Switch the ignition OFF.
If the specified value was Not obtained:
-- Check for an open or grounded circuit between terminal 1 and the appropriate fuse. Refer to appropriate System Wiring Diagram for fuse positions.
-- Check the wiring connection for damage, corrosion, loose or broken terminals.
-- If necessary, repair the faulty wiring connection.
-- Repair the circuit and replace any open fuses.
-- Go to Final procedures.
If the specified value was obtained:
Checking wiring
-- Remove the Engine Control Module - J623 -. Refer to the appropriate Service Information.
-- Using a Multimeter, check the Evaporative Emission (EVAP) Canister Purge Regulator Valve -N80- electrical harness connector to Engine Control Module -J623 - electrical harness connector T94.
| Evaporative Emission (EVAP) Canister Purge Regulator Valve - N80- electrical harness connector terminal: | Engine Control Module -J623- electrical connector T60 terminal: |
|---|---|
| 2 | 75 |
Specified value: 1.5 Ω max.
If the specified value was not obtained:
-- Check the wiring connection for an open circuit, short circuit to Battery voltage or Ground
-- Check the electrical harness connector for damage, corrosion, loose or broken terminals.
-- If necessary, repair the faulty wiring connection.
-- Go to Final procedures.
If the specified value was obtained:
-- If no faults were found Replace the Engine Control Module - J623 -. Refer to appropriate Service Information.
Final procedures
-- Reinstall the engine cover with air filter, if necessary. Refer to the appropriate Service Information.
-- After the repair work, the following work steps must be performed in the following sequence:
- Check the DTC memory. Refer to DIAGNOSTIC MODE 03 - READ DTC MEMORY .
- If necessary, erase the DTC memory. Refer to DIAGNOSTIC MODE 04 - ERASE DTC MEMORY .
- If the DTC memory was erased, generate readiness code. Refer to READINESS CODE .