TATF Shorted Wire Inspection
NOTICE:
Before disconnecting the TCM connector, jump the SCS line with the HDS, and wait more than 1 minute.
Test Procedure
- Preparation
-
- -
TCM connector (50P): disconnected
- -
Solenoid wire harness A connector (8P): disconnected
- -
- Procedure
-
- -
Perform the inspection according to the following table.
Refer to the Open/Shorted Wire Inspection Description for the method to inspect the shorted circuit below, then start to inspect according to circumstances.
- -
(Disconnected) TCM connector (50P) female terminals
IG Mode
Normal Conditions
TATF shorted to ground inspection
OFF
There is more than 1 MΩ
Results
- If abnormal, there is a problem in the circuit.