Neutral Position Switch: Installation: Procedure
- INSTALL NEUTRAL SWITCH
- Install the gasket.
*1 Neutral Switch Connector *2 Neutral Switch *3 Gasket N*m (kgf*cm, ft.*lbf):Specified torque • Non-reusable part - Install the neutral switch.
Torque: 24.5 N*m (250 kgf*cm, 18 ft.*lbf)
- Install the neutral switch connector.
- Install the air cleaner, air hose and fresh air duct as a single unit.
Refer to INSTALLATION
- Connect the negative battery cable.
Refer to CAUTION / NOTICE / HINT
- Install the gasket.