Battery / Charging System (Service Information): Generator: Reassembly: Procedure
- BRUSH ASSEMBLY NOTE
- GENERATOR ASSEMBLY
- Install the terminal B component.
Torque: 8.5 N*m (87 kgf*cm, 6 ft.*lbf)
*1 Rotor Component *2 Stator Coil Component *3 Pulley *4 Rotor *5 Front Bearing *6 Rear Bearing *7 Front Cover *8 Stator Coil *9 Rectifier *10 Regulator Component *11 Brush *12 Rear Cover *13 Terminal B Component - - N*m (kgf*cm, ft.*lbf): Specified torque - - - Install the rear cover.
- Install the brush.
See step 1
- Install the regulator component.
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
- Install the rectifier.
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
- Install the stator coil.
Torque: 2.0 N*m (20 kgf*cm, 18 in.*lbf)
- Install the front cover.
Bolt
Torque: 4.4 N*m (45 kgf*cm, 39 in.*lbf)
Screw
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
- Install the rear bearing.
- Install the front bearing.
- Install the rotor.
- Install the pulley.
Torque: 117.5 N*m (1198 kgf*cm, 87 ft.*lbf)
- Install the stator coil component.
- Install the rotor component.
- Install the terminal B component.