Inspection Procedure
NOTE:
When replacing the master cylinder solenoid, perform zero point calibration (See CALIBRATION
).
- CHECK BRAKE WARNING LIGHT
- Disconnect the skid control ECU connector.
- Turn the ignition switch to the ON position.
- Check that the BRAKE warning light comes on.
OK: BRAKE warning light comes on.
- Turn the ignition switch to OFF.
- Reconnect the skid control ECU connector.
OK: REPLACE MASTER CYLINDER SOLENOID
NG: Go To Next Step
- INSPECT BATTERY
- Check the battery voltage.
Standard: 11 to 14 V
NG: INSPECT CHARGING SYSTEM
OK: Go To Next Step
- Check the battery voltage.
- INSPECT FUSE (GAUGE)
- Remove the GAUGE fuse from the driver side J/B.
- Measure the resistance of the GAUGE fuse.
Standard: Below 1 Ω
- Reinstall the GAUGE fuse.
NG: CHECK FOR SHORTS IN ALL HARNESSES AND CONNECTORS CONNECTED TO FUSE AND REPLACE FUSE
OK: Go To Next Step
- CHECK HARNESS AND CONNECTOR (SKID CONTROL ECU - COMBINATION METER)
- Disconnect the skid control ECU connector.
- Disconnect the combination meter connector.
- Measure the resistance.
Standard
RESISTANCE SPECIFICATIONTester Connection Specified Condition S2-3 (BRL) - C10-10 Below 1 Ω - Measure the resistance.
Standard
RESISTANCE SPECIFICATIONTester Connection Specified Condition S2-3 (BRL) - Body ground 10 kΩ or higher - Reconnect the combination meter connector.
- Reconnect the skid control ECU connector.
NG: REPAIR OR REPLACE HARNESS OR CONNECTOR
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
OK: Go To Next Step
- INSPECT COMBINATION METER ASSEMBLY
- Check the combination meter system. (See COMBINATION METER
).
OK: Combination meter is normal.
NG: REPLACE COMBINATION METER ASSEMBLY
OK: CHECK FOR INTERMITTENT PROBLEMS
- Check the combination meter system. (See COMBINATION METER
).