LEMON Manuals: Even more car manuals for everyone

Inspection Procedure

  1. CHECK HARNESS AND CONNECTOR (MULTI-DISPLAY CONTROLLER SUB-ASSEMBLY - RADIO AND NAVIGATION) 
    1. Disconnect the R26 and R23 connectors.
    2. Measure the resistance according to the value(s) in the table below.

      OK 

      TESTER CONNECTION SPECIFIED CONDITION

      Symbol (Tester connection) Condition Specified condition
      NTS1 (R23-21) - NTSC (R26-1) Always Below 1 Ω
      SGN1 (R23-20) - SGD1 (R26-4) Always Below 1 Ω
      SG3 (R23-19) - SGND (R26-5) Always Below 1 Ω
      NTS1 (R23-21) - Body ground Always 10 kΩ or higher
      SGN1 (R23-20) - Body ground Always 10 kΩ or higher
      SG3 (R23-19) - Body ground Always 10 kΩ or higher

    NG: REPAIR OR REPLACE HARNESS OR CONNECTOR 

    Fig 1: Disconnecting R26 & R23 Connectors
    G04510828Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

    OK: PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN  PROBLEM SYMPTOMS TABLE