KNOCK SENSOR (for 2WD): Installation
- INSTALL KNOCK SENSOR
- Install the 2 knock sensors with the 2 bolts as shown in Fig 1.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Connect the 2 knock sensor connectors.
- Install the 2 knock sensors with the 2 bolts as shown in Fig 1.
- INSTALL WATER OUTLET PIPE NO. 1
- Install the water outlet pipe with the 3 bolts.
Torque: 9.0 N*m (92 kgf*cm, 80 in.*lbf)
- Install the 4 wire harness clamps.
- Install the water outlet pipe with the 3 bolts.
- CONNECT HEATER WATER INLET HOSE
- INSPECT CYLINDER HEAD SET BOLT (See INSPECTION )
- INSTALL CYLINDER HEAD SUB-ASSEMBLY (See INSTALLATION )
- INSTALL CAMSHAFT BEARING NO. 2
- INSTALL CAMSHAFTS (See INSTALLATION )
- INSTALL CHAIN TENSIONER ASSEMBLY NO. 2 (See INSTALLATION )
- INSTALL CAMSHAFT TIMING GEARS AND NO. 2 CHAIN (RH BANK) (See INSTALLATION )
- INSTALL CHAIN VIBRATION DAMPER NO. 1 (See INSTALLATION )
- INSTALL WATER BY-PASS JOINT RR (See INSTALLATION )
- INSTALL INTAKE MANIFOLD (See INSTALLATION )
- INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH (See INSTALLATION )
- INSTALL MANIFOLD STAY (See INSTALLATION )
- INSTALL EXHAUST PIPE ASSEMBLY FRONT (See INSTALLATION )
- INSTALL EXHAUST FRONT PIPE ASSEMBLY NO. 2 (See INSTALLATION )
- INSTALL COOL AIR INLET NO. 1
- Install the cool air inlet with the 2 bolts.
Torque: 12 N*m (122 kgf*cm, 9.0 ft.*lbf)
- Install the cool air inlet with the 2 bolts.
- INSTALL CHAIN TENSIONER SLIPPER
- INSTALL CHAIN TENSIONER ASSEMBLY NO. 1 (See INSTALLATION )
- INSTALL CHAIN SUB-ASSEMBLY (See INSTALLATION )
- INSTALL TIMING CHAIN OR BELT COVER SUB-ASSEMBLY (See REASSEMBLY )
- INSTALL ENGINE ASSEMBLY (See INSTALLATION )
- INSTALL BATTERY
- ADD ENGINE COOLANT (See COOLANT )
- ADD ENGINE OIL (See INSTALLATION )
- CHECK FOR ENGINE COOLANT LEAKAGE (See COOLANT )
- CHECK FOR ENGINE OIL LEAKAGE
- CHECK FOR FUEL LEAKAGE
- CHECK FOR EXHAUST GAS LEAKAGE
- INSPECT IGNITION TIMING (See ENGINE )
- INSPECT ENGINE IDLING SPEED (See ENGINE )
- INSPECT CO/HC (See ENGINE )