LEMON Manuals: Even more car manuals for everyone

Section 1 (Engine Unit (2WD)): Installation

WARNING: This page is about a different variant/trim than selected.
  1. INSTALL DRIVE PLATE 
    NOTE:
    • The mounting bolts are tightened in 2 progressive steps (steps  c and  e).
    • If any one of the mounting bolts is broken or deformed, replace it.
    1. Apply adhesive to 2 or 3 threads of the mounting bolt end.
      1. Adhesive: 
      2. Part No. 08833-00070, THREE BOND 1324 or equivalent 
      Fig 1: Applying Adhesive To Threads Of Mounting Bolt End
      G02927210Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the front spacer, drive plate and rear spacer on the crankshaft.
    3. Install and uniformly tighten the 8 mounting bolts in several passes, in the sequence shown.
      1. Torque: 49 N.m (500 kgf.cm, 36 ft.lbf) 

      If any one of the mounting bolts does not meet the torque specification, replace the mounting bolt.

      Fig 2: Installing Front Spacer, Drive Plate & Rear Spacer On Crankshaft
      G02927211Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Mark the mounting bolt with paint.
    5. Retighten the mounting bolts by 90° in the numerical order shown.
    6. Check that the painted mark is now at a 90° angle to (e).
      Fig 3: Retightening Mounting Bolts & Checking Painted Mark Angle
      G02927212Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL TRANSMISSION TO ENGINE 
    1. Check the torque converter clutch installation. (See INSTALLATION )
    2. Attach the transmission to the engine.
    3. Install the 10 bolts.
    1. Torque: 
    2. 37 N.m (380 kgf.cm, 27 ft.lbf) for 14 mm head 
    3. 72 N.m (730 kgf.cm, 53 ft.lbf) for 17 mm head 
    Fig 4: Installing Transmission To Engine
    G02927213Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL TORQUE CONVERTER CLUTCH BOLTS 
    1. Apply adhesive to 2 or 3 threads of the bolt end.
      1. Adhesive: 
      2. Part No. 08833-00070, THREE BOND 1324 or equivalent 
      Fig 5: Applying Adhesive To Threads Of Bolt End
      G02927214Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Hold the crankshaft pulley bolt with a wrench, and install the 6 bolts evenly.
      1. Torque: 48 N.m (490 kgf.cm, 35 ft.lbf) 
      NOTE: First install the black colored bolt, install the other bolts.
      Fig 6: Installing Crankshaft Pulley Bolt
      G02927215Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the flywheel housing under cover with the bolt.
    1. Torque: 18 N.m (185 kgf.cm, 13 ft.lbf) 
  4. INSTALL OIL COOLER PIPE FOR TRANSMISSION 
  5. INSTALL OIL DIPSTICK GUIDE AND DIPSTICK FOR TRANSMISSION 
    1. Install a new O-ring to the dipstick guide.
    2. Apply soapy water to the O-ring.
    3. Connect the dipstick guide end to the dipstick tube of the oil pan.
    4. Install the dipstick guide with the bolt.
    5. Install the dipstick.
    6. Connect the 2 breather hoses to the dipstick guide.
  6. CONNECT ENGINE WIRE TO TRANSMISSION 
    1. Connect the 5 connectors.
    2. Connect the 2 wire clamps.
      Fig 7: Installing Flywheel Housing Under Cover With Bolt
      G02927216Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  7. INSTALL ENGINE AND TRANSMISSION ASSEMBLY IN VEHICLE 
    1. Attach the engine chain hoist to the engine hangers.
    2. Slowly lower the engine and transmission assembly into the engine compartment.
    3. Attach the engine mounting brackets to the frame brackets.
      Fig 8: Lowering Engine Assembly Into Engine Compartment
      G02927217Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Keep the engine level with a jack.
      Fig 9: Identifying Jack For Keeping Engine Level
      G02927218Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  8. INSTALL ENGINE REAR MOUNTING BRACKET 
    1. Install the engine rear mounting bracket to the transmission with the 4 bolts.
      1. Torque: 65 N.m (663 kgf.cm, 48 ft.lbf) 
      Fig 10: Installing Engine Rear Mounting Bracket
      G02927219Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the frame crossmember with the 8 bolts and 4 nuts.
    1. Torque: 
    2. A: 18 N.m (183 kgf.cm, 13 ft.lbf) for bolts 
    3. 72 N.m (730 kgf.cm, 53 ft.lbf) for nuts 
    Fig 11: Installing Frame Crossmember
    G02927220Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  9. INSTALL ENGINE MOUNTING BRACKETS 
    1. Install the engine mounting brackets to the frame brackets with the 2 nuts and 4 bolts.
      1. Torque: 38 N.m (388 kgf.cm, 28 ft.lbf) 
    2. Remove the engine chain hoist.
      Fig 12: Installing Engine Mounting Bracket
      G02927221Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  10. INSTALL PS PUMP 

    Install the PS pump with the 3 bolts.

    1. Torque: 17 N.m (175 kgf.cm, 13 ft.lbf) 
    Fig 13: Installing PS Pump
    G02927222Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  11. w/ A/C: 
    1. INSTALL A/C COMPRESSOR 
    1. Install the A/C compressor with the 3 bolts.
      1. Torque: 49 N.m (500 kgf.cm, 36 ft.lbf) 
    2. Connect the A/C compressor connector.
      Fig 14: Installing A/C Compressor
      G02927223Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  12. INSTALL TRANSMISSION CONTROL CABLE 
    1. Install the control cable to the control shift lever.
      1. Torque: 13 N.m (130 kgf.cm, 9 ft.lbf) 
    2. Install the control cable bracket to the transmission with the 2 bolts.
  13. CONNECT POWER STEERING GEAR PIPES 

    Connect the pressure feed tube, turn tube and turn pressure tubes to the PS gear assembly. (See REMOVAL , DISASSEMBLY )

  14. INSTALL FRONT STABILIZER BAR (  STABILIZER BAR  ) 
  15. INSTALL PROPELLER SHAFT (See  INSTALLATION  ) 
  16. INSTALL FRONT EXHAUST PIPES (See  COMPONENTS  ) 
  17. CONNECT HOSES, WIRES, CONNECTORS, CLAMPS, GROMMET AND CABLES 
    1. Connect the 2 PS air hoses to hose clamp on the No.3 RH timing belt cover.
    2. Connect the generator wire.
    3. Connect the generator connector.
    4. Connect the hose clamp for the PS air hose.
    5. Connect the PS air hose to the upper intake manifold.
    6. Connect the 2 heater hoses.
    7. Connect the ground strap connector.
    8. Connect the fuel inlet hose and clamps.
    9. Connect the fuel return hose and clamp.
    10. Connect the air inlet hose to the charcoal canister.
    11. Connect the EVAP hose to the charcoal canister.
    12. Connect the brake booster tube.
  18. CONNECT ENGINE WIRE TO CABIN 
    1. Push into the engine wire through the cowl panel.
      Fig 15: Installing Transmission Control Cable
      G02927224Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the engine wire bracket with the 2 nuts and bolt and connect the engine wire to the bracket.
    3. Connect the 2 wire harness connectors (cassette connector).
    4. Connect the 3 connectors to the ECM.
    5. Install the ECM with the 3 screws.
    6. Install the lower No.2 panel.
    7. Install the glove compartment door.
  19. INSTALL FAN PULLEY, FAN, FLUID COUPLING AND DRIVE BELT 
    1. Temporarily install the fan pulley, the fan and fluid coupling assembly with the 4 nuts.
    2. Install the drive belt. ( GENERATOR )
    3. Tighten the 4 nuts holding the fluid coupling to the fan bracket.
      Fig 16: Installing Hoses
      G02927225Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  20. INSTALL BATTERY CABLES 
    1. Connect the clamp on battery negative (-) cable to No.2 relay box.
    2. Connect the battery positive (+) terminal cable.
    3. Connect the battery negative cable to the left fender apron.
  21. INSTALL AIR CLEANER AND INTAKE AIR CONNECTOR ASSEMBLY 
    1. Install the air cleaner with the 3 bolt.
      1. Torque: 5.0 N.m (51 kgf.cm, 44 in..lbf) 
    2. Connect the intake air connector to the throttle body.
    3. Connect the MAF meter connector.
    4. w/ A/C:

      Install the suction hose to the intake air connector.

    5. Connect the PS air hose, air inlet hose for EVAP, PCV hose and MAF meter wire to the air intake connector.
  22. INSTALL THROTTLE BODY COVER 
  23. INSTALL RADIATOR ASSEMBLY (See  INSTALLATION  ) 
  24. FILL WITH ENGINE COOLANT (See  REPLACEMENT  ) 
  25. FILL WITH ENGINE OIL (See  REPLACEMENT  ) 
  26. START ENGINE AND CHECK FOR LEAKS 
  27. INSTALL ENGINE UNDER COVER 
  28. INSTALL HOOD 
  29. PERFORM ROAD TEST 

    Check for abnormal noise, shock, slippage, correct shift points and smooth operation.

  30. RECHECK ENGINE COOLANT AND OIL LEVELS