Vacuum Control Valve (VCV)
- Remove VCV. Connect a hand vacuum pump to port "S", and block ports "R" and "Y" on Tercel valve. With specified vacuum applied, blow into port "T" on Tercel valve and port "Y" on all others.
- Air should come out specified ports. Stop vacuum application and blow into valve. No air should come out.
Vacuum Control Valve Testing
| Application | Vacuum (In. Hg) | Open Ports |
|---|---|---|
| Celica Supra Cressida | 3.5 | U, V |
| Land Cruiser | 2.75 | Z |
| Tercel | 3.5 | U, W, Z |