AT Shift Lock Solenoid and "P" Range Switch: Inspection
DIAGNOSIS PROCEDURE
| Step | Check | Yes | No |
|---|---|---|---|
| 1 CHECK SHIFT LOCK SOLENOID. Measure the resistance of shift lock solenoid connector terminals. Terminals No. 4 - No. 5: |
Is the resistance between 20 and 40 Ω? | Go to step 2. | Replace the shift lock solenoid and "P" range switch assembly. |
| 2 CHECK SHIFT LOCK SOLENOID. Connect the battery with shift lock solenoid connector terminal, operate solenoid. Terminals No. 4 (+) - No. 5 (-): |
Is the shift lock solenoid operating properly? | Go to step 3. | Replace the shift lock solenoid and "P" range switch assembly. |
3 CHECK "P" RANGE SWITCH.
|
Is the resistance less than 1 Ω? | Go to step 4. | Replace the "P" range switch. |
4 CHECK "P" RANGE SWITCH.
|
Is the resistance more than 1 MΩ? | Normal | Replace the "P" range switch. |