LEMON Manuals: Even more car manuals for everyone

AT Shift Lock Solenoid and "P" Range Switch: Inspection

DIAGNOSIS PROCEDURE

Step Check Yes No
1 CHECK SHIFT LOCK SOLENOID. 
Measure the resistance of shift lock solenoid connector terminals.
Terminals 
No. 4 - No. 5: 
Is the resistance between 20 and 40 Ω? Go to step 2.  Replace the shift lock solenoid and "P" range switch assembly.
2 CHECK SHIFT LOCK SOLENOID. 
Connect the battery with shift lock solenoid connector terminal, operate solenoid.
Terminals 
No. 4 (+) - No. 5 (-): 
Is the shift lock solenoid operating properly? Go to step 3.  Replace the shift lock solenoid and "P" range switch assembly.
3 CHECK "P" RANGE SWITCH. 
  1. Move the select lever to "P" range.
  2. Measure the resistance between "P" range switch connector terminals.
Is the resistance less than 1 Ω? Go to step 4.  Replace the "P" range switch.
4 CHECK "P" RANGE SWITCH. 
  1. Move the select lever to other than "P" range.
  2. Measure the resistance between "P" range switch connector terminals.
Is the resistance more than 1 MΩ? Normal Replace the "P" range switch.