LEMON Manuals: Even more car manuals for everyone

Installation Procedure

  1. Install the positive battery cable to the conduit.
    Fig 1: View Of Cable Connections At Starter
    GM1804775Courtesy of GENERAL MOTORS CORP.
  2. Install the positive battery cable terminal (3).
    NOTE: Refer to Fastener Notice .
  3. Install the positive battery cable terminal nut (2) to the starter.

    Tighten:  Tighten the nut to 9 N.m (80 lb in).

  4. Install the positive battery cable clip (1) to the bracket.
  5. Install the positive battery cable channel locating pin (4) to the oil pan.
    Fig 2: View Of Negative Battery Cable Ground Terminal At Engine Block
    GM1804776Courtesy of GENERAL MOTORS CORP.
  6. Install the positive battery cable channel bolt (3).

    Tighten:  Tighten the bolt to 12 N.m (106 lb in).

  7. Install the engine protection shield. Refer to Engine Protection Shield Replacement .
  8. Install the positive battery cable terminal (3) to the generator.
    Fig 3: View Of Negative Battery Cable Ground Terminal Bolt At Shock Tower
    GM1804773Courtesy of GENERAL MOTORS CORP.
  9. Install the positive battery cable nut (1).

    Tighten:  Tighten the nut to 9 N.m (80 lb in).

  10. Position the positive battery cable boot (2).
  11. Close the clips (4) on the retaining brackets.
  12. Install the positive battery cable terminal (2) to the junction block.
    Fig 4: Identifying Positive Battery Cable Terminal At Junction Block
    GM1804778Courtesy of GENERAL MOTORS CORP.
  13. Tighten the positive battery cable terminal bolt (1) at the junction block.

    Tighten:  Tighten the bolt to 10 N.m (89 lb in).

  14. Position the positive battery cable (1) to the battery.
    Fig 5: View Of Battery & Cables
    GM1804767Courtesy of GENERAL MOTORS CORP.
  15. Tighten the battery positive cable bolt.

    Tighten:  Tighten the bolt to 15 N.m (11 lb ft).

  16. Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .