2.5L, 3.0L, 3.9L, 5.2L & 5.9L
- Unplug coil connector and coil. Connect a pair of jumper wires between coil and coil connector. Ensure sufficient battery voltage (12.4 volts) is available to crank engine and operate ignition systems. Crank engine for 5 seconds while monitoring voltage at coil positive terminal.
- If voltage remains near zero during entire period of cranking, see appropriate TESTS W/CODES
article in the ENGINE PERFORMANCE Section to check SBEC and ASD relay. If voltage is near battery voltage and drops to zero after 1-2 seconds of cranking, see appropriate TESTS W/CODES
article in the ENGINE PERFORMANCE Section to check distributor pick-up circuit to SBEC.
- If voltage remains near battery voltage during entire 5 seconds, turn ignition switch to OFF position. Disconnect SBEC 60-pin connector. Check 60-pin connector for loose terminals (push-outs).
- Remove positive lead from coil. Connect a jumper wire between positive battery terminal and coil positive terminal. Using a specially constructed jumper wire, momentarily ground SBEC harness connector terminal No. 19. See Fig 1
and Fig 2
.
Spark should be generated when ground connection is disconnected.
- If spark is generated, replace SBEC. If no spark is generated, use special jumper wire directly on coil negative terminal. If spark is produced, repair wiring harness for an open circuit. If no spark is produced, replace ignition coil.
Courtesy of CHRYSLER MOTORS.
Courtesy of CHRYSLER MOTORS.