LEMON Manuals: Even more car manuals for everyone

Diagnosis Procedure

Regarding Wiring Diagram information, refer to "WIRING DIAGRAM ".

  1. INSPECTION START 

    Will CONSULT be used?

    Will CONSULT be used? 

    YES: GO TO 2.

    NO: GO TO  3.

  2. CHECK EVAP CANISTER VENT CONTROL VALVE CIRCUIT 

    With CONSULT 

    1. Turn ignition switch OFF and then ON.
    2. Select "VENT CONTROL/V" in "ACTIVE TEST" mode with CONSULT.
    3. Touch "ON/OFF" on CONSULT screen.
    4. Check for operating sound of the valve.

      Clicking sound should be heard. 

      Is the inspection result normal? 

      YES: GO TO  7.

      NO: GO TO 3.

  3. CHECK EVAP CANISTER VENT CONTROL VALVE POWER SUPPLY CIRCUIT 
    1. Turn ignition switch OFF.
    2. Disconnect EVAP canister vent control valve harness connector.
    3. Turn ignition switch ON.
    4. Check the voltage between EVAP canister vent control valve harness connector and ground.
      EVAP canister vent control valve Ground Voltage
      Connector Terminal
      B39 1 Ground Battery voltage
      Fig 1: Checking Voltage Between EVAP Canister Vent Control Valve Harness Connector And Ground
      G04874990Courtesy of NISSAN NORTH AMERICA, INC.

      Is the inspection result normal? 

      YES: GO TO  5.

      NO: GO TO 4.

  4. DETECT MALFUNCTIONING PART 

    Check the following.

    • Harness connectors B10, E29
    • Harness connectors E11, F2
    • Harness for open or short between EVAP canister vent control valve and IPDM E/R

      : Repair open circuit, short to ground or short to power in harness or connectors.

  5. CHECK EVAP CANISTER VENT CONTROL VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT 
    1. Turn ignition switch OFF.
    2. Disconnect ECM harness connector.
    3. Check the continuity between ECM harness connector and EVAP canister vent control valve harness connector.

      Refer to WIRING DIAGRAM .

      EVAP canister vent control valve ECM Continuity
      Connector Terminal Connector Terminal
      B39 2 E10 109 Existed
    4. Also check harness for short to ground and short to power.

      Is the inspection result normal? 

      YES: GO TO  7.

      NO: GO TO 6.

  6. DETECT MALFUNCTIONING PART 

    Check the following.

    • Harness connectors B10, E29
    • Harness for open or short between EVAP canister vent control valve and ECM

      : Repair open circuit, short to ground or short to power in harness or connectors.

  7. CHECK RUBBER TUBE FOR CLOGGING 
    1. Disconnect rubber tube connected to EVAP canister vent control valve.
    2. Check the rubber tube for clogging.

      Is the inspection result normal? 

      YES: GO TO 8.

      NO: Clean the rubber tube using an air blower.

  8. CHECK DRAIN FILTER 

    Refer to "COMPONENT INSPECTION ".

    Is the inspection result normal? 

    YES: GO TO 9.

    NO: Replace drain filter.

  9. CHECK EVAP CANISTER VENT CONTROL VALVE 

    Refer to "COMPONENT INSPECTION ".

    Is the inspection result normal? 

    YES: GO TO 10.

    NO: Replace EVAP canister vent control valve. Refer to "REMOVAL AND INSTALLATION ".

  10. CHECK INTERMITTENT INCIDENT 

    Refer to "INTERMITTENT INCIDENT ".

    : INSPECTION END