LEMON Manuals: Even more car manuals for everyone

Parking Brake Switch Signal Inspection

  1. CHECK PARKING BRAKE SWITCH SIGNAL INPUT (COMBINATION METER)
    1. Turn ignition switch ON.
    2. Check voltage between combination meter harness connector M24 terminal 24 and ground.
      Terminals Condition Voltage (Approx.)
      (+) (-)
      Combination meter connector Terminal
      M24 24 Ground Parking brake released Battery voltage
      Parking brake applied 0
      Fig 1: Checking Parking Brake Switch Signal Input (Combination Meter)
      G06553700Courtesy of NISSAN NORTH AMERICA, INC.

      OK or NG 

      OK: Replace combination meter. Refer to , "REMOVAL AND INSTALLATION ".

      NG: GO TO 2.

  2. CHECK PARKING BRAKE SWITCH CIRCUIT
    1. Turn ignition switch OFF.
    2. Disconnect combination meter connector and parking brake switch connector.
    3. Check continuity between combination meter harness connector (A) and parking brake switch harness connector (B).
      A B Continuity
      Connector Terminal Connector Terminal
      M24 24 B24 1 Yes
    4. Check continuity between combination meter harness connector (A) and ground.
      A Ground Continuity
      Connector Terminal
      M24 24 No
      Fig 2: Checking Parking Brake Switch Circuit
      G06553701Courtesy of NISSAN NORTH AMERICA, INC.

      OK or NG 

      OK: GO TO 3.

      NG: Repair harness or connector.

  3. CHECK PARKING BRAKE SWITCH

    Check parking brake switch. Refer to , "ELECTRICAL COMPONENT INSPECTION ".

    OK or NG 

    OK: Check parking brake switch case ground.

    NG: Replace parking brake switch.