Diagnosis Procedure
- CHECK TERMINAL "1" CONNECTION
- Turn ignition switch OFF.
- Check if terminal "1" is clean and tight.
Is the inspection result normal?
YES: GO TO 2.
NO: Repair terminal "1" connection. Confirm repair by performing complete Starting/Charging system test. Refer to Technical Service Bulletin.
- CHECK TERMINAL "1" CIRCUIT
Check voltage between generator connector F6 terminal 1 and ground.
1-ground Battery voltage
Is the inspection result normal?
YES: GO TO 3.
NO: Check harness for open between generator and fusible link.
- CHECK TERMINAL "1" CONNECTION (VOLTAGE DROP TEST)
- Start engine, then engine running at idle and warm.
- Check voltage between battery positive terminal and generator connector F6 terminal 1.
1-B+ Less than 0.2V
Is the inspection result normal?
YES: Terminal "1" circuit is normal. Refer to "WORK FLOW ".
NO: Check harness between battery and generator for high resistance.