Diagnostic Procedure
- CHECK VIAS CONTROL SOLENOID VALVE POWER SUPPLY CIRCUIT
- Turn ignition switch OFF.
- Disconnect VIAS control solenoid valve harness connector.
- Turn ignition switch ON.
- Check voltage between terminal 1 and ground with CONSULT-II or tester.
Voltage: Battery voltage
OK or NG
- OK : GO TO 3.
- NG : GO TO 2.
- DETECT MALFUNCTIONING PART
Check the following.
- Harness connectors E20, F32
- IPDM E/R connector E122
- 10 A fuse
- Harness for open or short between IPDM E/R and VIAS control solenoid valve
- : Repair or replace harness or connectors.
- CHECK VIAS CONTROL SOLENOID VALVE OUTPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
- Turn ignition switch OFF.
- Disconnect ECM harness connector.
- Check harness continuity between ECM terminal 29 and VIAS control solenoid valve terminal 2. Refer to Wiring Diagram .
Continuity should exist.
- Also check harness for short to ground and short to power.
OK or NG
- OK : GO TO 4.
- NG : Repair open circuit or short to ground or short to power in harness or connectors.
- CHECK VIAS CONTROL SOLENOID VALVE
Refer to "COMPONENT INSPECTION ".
OK or NG
- OK : GO TO 5.
- NG : Replace VIAS control solenoid valve.
- CHECK INTERMITTENT INCIDENT
Refer to "TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT ".
- >> INSPECTION END