LEMON Manuals
: Even more car manuals for everyone
Home
›
Mitsubishi
›
2020
›
Mirage SE
›
Repair and Diagnosis
›
Engine Mechanical
›
Cooling System (Mechanical)
›
Engine Cooling
›
Radiator
›
Removal And Installation
›
Notes
Removal And Installation: Notes
Pre-removal Operation
Engine Coolant Draining (Refer to
ENGINE COOLANT REPLACEMENT
).
Front End Upper Bar Removal (Refer to
LOOSE PANEL
).
Post-installation Operation
Front End Upper Bar Installation (Refer to
LOOSE PANEL
).
Engine Coolant Refilling (Refer to
ENGINE COOLANT REPLACEMENT
).
<M/T>
Fig 1: Removing/Installing Radiator Components Location With Torque Specification (M/T)
Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
<CVT>
Fig 2: Removing/Installing Radiator Components Location With Torque Specification (CVT)
Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.