| 1 |
VERIFY FREEZE FRAME DATA AND DIAGNOSTIC MONITORING TEST RESULTS HAVE BEEN RECORDED
- Have FREEZE FRAME DATA and DIAGNOSTIC MONITORING TEST RESULTS (CCM related) been recorded?
|
Yes |
Go to the next step. |
| No |
Record FREEZE FRAME DATA and DIAGNOSTIC MONITORING TEST RESULTS on repair order, then go to the next step. |
| 2 |
VERIFY RELATED REPAIR INFORMATION AVAILABILITY
- Check for related Service Bulletins and/or online repair information availability.
- Is any related repair information available?
|
Yes |
Perform repair or diagnosis according to available repair information.
- If vehicle is not repaired, go to the next step.
|
| No |
Go to the next step. |
| 3 |
VERIFY RELATED PENDING CODE OR STORED DTC
- Turn the ignition switch off, then to the ON position (Engine off).
- Verify related PENDING CODE or stored DTC.
- Is DTC P2405 present?
|
Yes |
Go to the applicable DTC inspection. (See
DTC P2405 ). |
| No |
Go to the next step. |
| 4 |
INSPECT EVAP SYSTEM LEAK DETECTION PUMP CONNECTOR FOR POOR CONNECTION
- Turn the ignition switch off.
- Disconnect EVAP system leak detection pump connector.
- Inspect for poor connection (such as damaged/pulled-out pins, corrosion).
- Is there any malfunction?
|
Yes |
Repair or replace the terminal, then go to Step 10. |
| No |
Go to the next step. |
| 5 |
INSPECT EVAP SYSTEM LEAK DETECTION PUMP MOTOR GROUND CIRCUIT FOR OPEN CIRCUIT
- Inspect for continuity between EVAP system leak detection pimp terminal B (wiring harness side) and body ground.
- Is there continuity?
|
Yes |
Go to the next step. |
| No |
Repair or replace wiring harness for open circuit, then go to Step 10. |
| 6 |
INSPECT PCM CONNECTOR FOR POOR CONNECTION
- Turn the ignition switch off.
- Disconnect the PCM connector.
- Inspect for poor connection (such as damaged, pulled-out pins, corrosion).
- Is there any malfunction?
|
Yes |
Repair the terminal, then go to Step 10. |
| No |
Go to the next step. |
| 7 |
INSPECT EVAP SYSTEM LEAK DETECTION PUMP MOTOR CIRCUIT FOR SHORT TO GROUND
- Inspect for continuity between EVAP system leak detection pump terminal D (wiring harness-side) and body ground.
- Is there continuity?
|
Yes |
Repair or replace the wiring harness for short to ground, then go to Step 10. |
| No |
Go to the next step. |
| 8 |
INSPECT EVAP SYSTEM LEAK DETECTION PUMP MOTOR CIRCUIT FOR OPEN CIRCUIT
- Inspect for continuity between EVAP system leak detection pump terminal D (wiring harness-side) and PCM terminal 1U , 1AF (wiring harness-side).
- Is there continuity?
|
Yes |
Go to the next step. |
| No |
Repair or replace wiring harness for open circuit, then go to Step 10. |
| 9 |
INSPECT EVAP SYSTEM LEAK DETECTION PUMP
|
Yes |
Go to the next step. |
| No |
Replace the EVAP system leak detection pump, then go to the next step. |
| 10 |
VERIFY TROUBLESHOOTING OF DTC P2401 COMPLETED
|
Yes |
Replace the PCM, then go to the next step. |
| No |
Go to the next step. |
| 11 |
VERIFY AFTER REPAIR PROCEDURE
|
Yes |
Go to the applicable DTC inspection. (See
DTC TABLE
). |
| No |
Troubleshooting completed. |