LEMON Manuals: Even more car manuals for everyone

Installation [10/2023 - ]: Procedure

  1. INSTALL NO. 5 HEIGHT CONTROL TUBE 
    1. Pass the No. 5 height control tube out from the trunk room to the outside of the vehicle.
      GTY786030Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Pull the grommet through the lower side of the vehicle (exterior) and attach it.
    3. Connect the No. 5 height control tube to the No. 3 height control valve assembly.
      GTY785917Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Refer to PRECAUTION [10/2017 - ]

      NOTE:

      Replace the O-ring, plate and No. 2 connector with new ones.

    4. Connect the clamp.
      GTY785916Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL HEIGHT CONTROL PRESSURE SENSOR 
    1. Apply a light coat of lithium soap base glycol grease to a new O-ring.
      GTY829641Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the O-ring to the height control pressure sensor.
    3. Install the height control pressure sensor to the pneumatic tank with tube assembly.

      Torque: 10.8 N.m (110 kgf/cm, 8 ft.lbf) 

  3. INSTALL PNEUMATIC TANK WITH TUBE ASSEMBLY 
    1. Install the pneumatic tank with tube assembly with the 3 bolts.

      Torque: 19.1 N.m (195 kgf/cm, 14 ft.lbf) 

      GTY785923Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  4. CONNECT NO. 5 HEIGHT CONTROL TUBE 
    1. Connect the clamp.
      GTY785922Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the No. 5 height control tube to the pneumatic tank with tube assembly.

      Refer to PRECAUTION [10/2017 - ]

      NOTE:

      Replace the O-ring, plate and No. 2 connector with new ones.

    3. Connect the harness clamp.
    4. Connect the connector.
  5. INSTALL BATTERY CARRIER CATCH BRACKET SUB-ASSEMBLY 
    1. Install the battery carrier catch bracket sub-assembly to the luggage room panel with the 4 nuts.

      Torque: 8.5 N.m (87 kgf/cm, 75 in.lbf) 

  6. INSTALL LOWER INNER LUGGAGE COMPARTMENT TRIM COVER 

    Refer to PROCEDURE - Step 9

  7. INSTALL LUGGAGE COMPARTMENT FLOOR MAT 

    Refer to PROCEDURE - Step 14

  8. INSTALL TOOL BOX 

    Refer to PROCEDURE - Step 3

  9. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL 

    Refer to INSTALLATION [10/2023 - ]

  10. AIR CHARGING 

    Refer to PRECAUTION [10/2017 - ]

    HINT: 

    • Make sure to use the nitrogen gas injector (SST) and adapter (SST).
    • Select an adapter (SST) that matches the standard of the nitrogen cylinder and install it.
    • The adapter (SST) is not required for JIS standard.
    • SST: 09761-50010 
    • SST: 09761-0504009761-0505009761-0506009761-05070 
  11. CHECK CONNECTIONS OF TUBES FOR AIR LEAKAGE 

    Refer to OPERATION CHECK [10/2017 - ]

  12. INSTALL NO. 1 FLOOR UNDER COVER 

    Refer to PROCEDURE - Step 6

  13. CHECK VEHICLE HEIGHT 
    NOTE:

    If the height control sensor link is removed, check the vehicle height.

    1. Change the height control switch from the "NORM" position to the "HIGH" position and back to the "NORM" position again.
    2. Measure the vehicle height.

      Refer to PROCEDURE - Step 2

  14. ADJUST VEHICLE HEIGHT 

    Refer to ADJUSTMENT [10/2023 - ]

    NOTE:

    If the height control sensor has been replaced, be sure to adjust the vehicle height.

  15. CHECK HEIGHT CHANGE OPERATION 

    Refer to OPERATION CHECK [10/2017 - ]

  16. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL 

    Refer to WORK PROCEDURE [10/2022 - ]

    HINT: 

    When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

    Refer to AUTOMATIC LEARNING CHART [10/2023 - ]