LEMON Manuals: Even more car manuals for everyone

Installation [12/2017 - 10/2020]: Procedure

  1. INSTALL NO. 6 ENGINE COVER 

    Refer to PROCEDURE - Step 32 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 32 [09/2018 - 10/2020]

  2. INSTALL TIMING CHAIN COVER ASSEMBLY 

    Refer to PROCEDURE - Step 33 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 33 [09/2018 - 10/2020]

  3. INSTALL CRANKSHAFT TIMING GEAR OR SPROCKET 

    Refer to PROCEDURE - Step 34 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 34 [09/2018 - 10/2020]

  4. INSTALL NO. 2 CHAIN VIBRATION DAMPER 

    Refer to PROCEDURE - Step 35 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 35 [09/2018 - 10/2020]

  5. INSTALL NO. 1 CHAIN VIBRATION DAMPER 

    Refer to PROCEDURE - Step 36 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 36 [09/2018 - 10/2020]

  6. INSTALL IDLE SPROCKET ASSEMBLY 

    Refer to PROCEDURE - Step 37 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 37 [09/2018 - 10/2020]

  7. INSTALL NO. 1 CHAIN SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 38 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 38 [09/2018 - 10/2020]

  8. INSTALL CHAIN TENSIONER SLIPPER 

    Refer to PROCEDURE - Step 39 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 39 [09/2018 - 10/2020]

  9. INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY 

    Refer to PROCEDURE - Step 40 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 40 [09/2018 - 10/2020]

  10. INSPECT VALVE TIMING 

    Refer to PROCEDURE - Step 41 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 41 [09/2018 - 10/2020]

  11. INSTALL OIL PUMP DRIVE CHAIN SUB-ASSEMBLY 
    1. Rotate the crankshaft timing gear key position 30° counterclockwise as shown in the illustration.
      GTY780938Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *1 Oil Pump Drive Sprocket
      *2 Oil Pump Drive Shaft Sprocket
      *3 Oil Pump Drive Chain Sub-assembly
      *a Mark Plate
      *b Timing Mark
      *c D Cut Plane
    2. Set the D cut plane of the oil pump shaft at the position shown in the illustration.
    3. Align the mark plates (yellow) on the oil pump drive sprocket, oil pump drive shaft sprocket and oil pump drive chain sub-assembly with the timing marks.
    4. Install them to the oil pump shaft and crankshaft.
    5. Temporarily install the oil pump drive shaft gear nut.
    6. While pushing the chain damper spring, install the chain tensioner plate and chain damper spring.
    7. Using the hexagonal portion of the camshaft, secure the camshaft.
    8. Tighten the oil pump drive shaft gear nut.

      Torque: 36 N*m (367 kgf*cm, 27 ft.*lbf) 

  12. INSTALL TIMING CHAIN OR BELT COVER SUB-ASSEMBLY 
    1. Remove any old packing remaining on the sealing surfaces before applying seal packing.
    2. Clean the contact surfaces of the timing chain cover assembly, timing chain or belt cover sub-assembly and confirm that there is no oil, moisture or other foreign matter on the surfaces.
      GTY799188Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Timing Chain Cover Assembly Side *b Timing Chain or Belt Cover Sub-assembly Side
      Clean and Degrease - -
      NOTE:
      • Be sure to clean and degrease the contact surfaces, especially the surfaces indicated in the illustration.
      • Check the bolts and bolt holes, and clean and degrease them.
    3. Install 2 new water pump gaskets to the timing chain cover assembly.
    4. Apply seal packing in a continuous line to the timing chain or belt cover sub-assembly as shown in the illustration.
      NOTE:
      • Using non-residue solvent, clean and remove any oil from the installation surface.
      • Check the bolts and bolt holes, and clean and degrease them.
      • Install the timing chain or belt cover sub-assembly within 3 minutes and tighten the bolts within 15 minutes of applying seal packing.
      • Do not add engine oil for at least 2 hours after installing the timing chain cover assembly.
      • Do not start the engine for at least 2 hours after installing the timing chain cover assembly.
      GTY806872Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Standard Seal Packing Diameter
      3.0 to 4.0 mm (0.118 to 0.157 in.)
      *b Seal Packing Width 35 mm (1.38 in.)
      *c Thick Coating Cross-section
      *d Wide Seal Packing Diameter
      4.0 to 8.0 mm (0.157 to 0.314 in.)
      *e Wide Seal Packing Diameter
      3.0 to 5.0 mm (0.118 to 0.197 in.)
      Seal Packing
    5. Temporarily install the timing chain or belt cover sub-assembly with the 27 bolts.
      Fig 1: Timing Chain Or Belt Cover Sub-Assembly With The 27 Bolts Tightening Sequence
      GTY835167Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Type of bolt *b Tightening Order

      Bolt Length

      Item Length
      A 35 mm (1.38 in.)
      B 80 mm (3.15 in.)
      C 90 mm (3.54 in.)
      D 55 mm (2.17 in.)
      NOTE:

      Make sure that there is no oil on the bolt threads.

    6. Tighten the 27 bolts in several steps, in the sequence shown in the illustration.

      Bolts A, B and D 

      Torque: 29 N*m (296 kgf*cm, 21 ft.*lbf) 

      Bolt C 

      Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf) 

  13. INSTALL TIMING CHAIN CASE OIL SEAL 

    Refer to PROCEDURE - Step 1

  14. INSTALL CRANKSHAFT PULLEY 

    Refer to PROCEDURE - Step 2

  15. INSTALL CRANKSHAFT DAMPER SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 3

  16. INSTALL CRANKSHAFT PULLEY COVER 

    Refer to PROCEDURE - Step 4

  17. INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY LH 

    Refer to PROCEDURE - Step 1

  18. INSTALL CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY RH 

    Refer to PROCEDURE - Step 1

  19. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY LH 

    Refer to PROCEDURE - Step 1

  20. INSTALL CAM TIMING OIL CONTROL SOLENOID ASSEMBLY RH 

    Refer to PROCEDURE - Step 1

  21. INSTALL SPARK PLUG TUBE GASKET 

    Refer to PROCEDURE - Step 56 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 56 [09/2018 - 10/2020]

  22. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY RH 
    1. Install a new No. 1 cylinder head cover gasket RH to the cylinder head cover sub-assembly RH.
    2. Install 6 new No. 2 cylinder head cover gasket RH to the cylinder head cover sub-assembly RH.
    3. Before applying seal packing black, cleanly remove any old sealant sticking to the part to be sealed.
    4. Remove any remaining seal packing material and be careful not to drop any oil on the contact surfaces of the cylinder head sub-assembly, timing chain cover assembly and cylinder head cover sub-assembly.
    5. Apply seal packing as shown in the illustration.

      Seal packing

      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

      Standard seal diameter

      3.0 to 6.0 mm (0.118 to 0.236 in.)

      NOTE:
      • Remove any oil from the contact surface.
      • Install the cylinder head cover sub-assembly within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
      GTY833437Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Application Width 20 to 30 mm (0.787 to 1.181 in.) *b Application Range
    6. Install a new camshaft bearing cap oil hole gasket RH to the camshaft bearing cap.
      GTY776523Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Degrease the threads of the 14 cylinder head cover installation bolts (A).
      Fig 2: Cylinder Head Cover Sub-Assembly RH With The 16 Bolts Tightening Sequence
      GTY791175Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Bolt A
      Bolt B
    8. Install the new 2 O-rings to the 2 VVT sensors.

      Refer to INSTALLATION [12/2017 - ]

    9. Temporarily install the 2 VVT sensors with the 2 new bolts (B).
    10. Temporarily install the cylinder head cover sub-assembly RH with the 14 bolts (A).
    11. Temporarily install the cylinder head cover sub-assembly with the 16 bolts. Tighten the bolts uniformly in several steps.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

      Bolt Length

      Item Length
      Bolt A 23.5 mm (0.925 in.)
      Bolt B 30 mm (1.18 in.)
      NOTE:

      Do not start the engine for at least 2 hours after installation.

    12. Install the No. 1 intercooler air guide to the cylinder head cover sub-assembly RH.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

  23. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH 
    1. Install a new No. 1 cylinder head cover gasket LH to the cylinder head cover sub-assembly LH.
    2. Install 6 new No. 2 cylinder head cover gasket LH to the cylinder head cover sub-assembly LH.
    3. Before applying seal packing black, cleanly remove any old sealant sticking to the part to be sealed.
    4. Remove any remaining seal packing material and be careful not to drop any oil on the contact surfaces of the cylinder head sub-assembly, timing chain cover assembly and cylinder head cover sub-assembly LH.
    5. Apply seal packing as shown in the illustration.

      Seal packing

      Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

      Standard seal diameter

      3.0 to 6.0 mm (0.118 to 0.236 in.)

      NOTE:
      • Remove any oil from the contact surface.
      • Install the cylinder head cover sub-assembly LH within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
      GTY824503Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      *a Application Width 20 to 30 mm (0.787 to 1.181 in.) - -
    6. Install a new camshaft bearing cap oil hole gasket LH to the camshaft bearing cap.
      GTY776519Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Degrease the threads of the 14 cylinder head cover installation bolts (A).
      Fig 3: Cylinder Head Cover Sub-Assembly LH With The 16 Bolts Tightening Sequence
      GTY798034Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      Bolt A
      Bolt B
    8. Install the new 2 O-rings to the 2 VVT sensors.

      Refer to INSTALLATION [12/2017 - ]

    9. Temporarily install the 2 VVT sensors with the 2 new bolts (B).
    10. Temporarily install the cylinder head cover sub-assembly RH with the 14 bolts (A).
    11. Temporarily install the cylinder head cover sub-assembly LH with the 16 bolts. Tighten the bolts uniformly in several steps.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

      Bolt Length

      Item Length
      Bolt A 23.5 mm (0.925 in.)
      Bolt B 30 mm (1.18 in.)
      NOTE:

      Do not start the engine for at least 2 hours after installation.

    12. Install the No. 1 intercooler air guide to the cylinder head cover sub-assembly LH.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

  24. INSTALL NO. 2 ENGINE COVER RH 

    Refer to PROCEDURE - Step 63 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 63 [09/2018 - 10/2020]

  25. INSTALL NO. 2 ENGINE COVER LH 

    Refer to PROCEDURE - Step 64 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 64 [09/2018 - 10/2020]

  26. INSTALL SPARK PLUG 

    Refer to PROCEDURE - Step 1

  27. INSTALL OIL FILTER BRACKET SUB-ASSEMBLY 
    1. Install 2 new gaskets to the timing chain cover assembly.
    2. Install the oil filter bracket sub-assembly with the 3 bolts.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

  28. INSTALL IGNITION COIL ASSEMBLY 

    Refer to PROCEDURE - Step 2

  29. INSTALL GENERATOR BRACKET SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 51 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 51 [09/2018 - 10/2020]

  30. INSTALL WATER INLET ASSEMBLY 

    Refer to PROCEDURE - Step 4

  31. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY 

    Refer to PROCEDURE - Step 7

  32. INSTALL IDLER PULLEY SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 8

  33. INSTALL WATER PUMP PULLEY 

    Refer to PROCEDURE - Step 9

  34. CONNECT NO. 4 RADIATOR HOSE 

    Refer to PROCEDURE - Step 12

  35. INSTALL WATER OUTLET PIPE WATER BY-PASS JOINT 

    Refer to PROCEDURE - Step 83 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 83 [09/2018 - 10/2020]

  36. INSTALL NO. 2 WATER OUTLET PIPE 

    Refer to PROCEDURE - Step 84 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 84 [09/2018 - 10/2020]

  37. INSTALL NO. 1 WATER OUTLET PIPE 

    Refer to PROCEDURE - Step 85 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 85 [09/2018 - 10/2020]

  38. INSTALL NO. 11 ENGINE WIRE 

    Refer to PROCEDURE - Step 7

  39. INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY 

    Refer to PROCEDURE - Step 8

  40. INSTALL WATER CONTROL VALVE 

    Refer to PROCEDURE - Step 1

  41. INSTALL INTAKE PIPE STAY 

    Refer to PROCEDURE - Step 7

  42. INSTALL NO. 1 TURBO PRESSURE SENSOR 

    Refer to PROCEDURE - Step 2

  43. CONNECT NO. 1 WATER BY-PASS PIPE 
    1. Connect the No. 1 water by-pass pipe with the 3 bolts.

      Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf) 

  44. INSTALL WATER HOSE 

    Refer to PROCEDURE - Step 9

  45. CONNECT NO. 1 TURBO WATER PIPE SUB-ASSEMBLY 
    1. Connect the No. 1 turbo water pipe sub-assembly to the cylinder head cover sub-assembly RH with the bolt.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

  46. INSTALL TURBO WATER PIPE STAY 
    1. Install the turbo water pipe stay with the 2 bolts.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

  47. INSTALL NO. 2 AIR INLET DUCT 
    1. Connect the No. 2 air inlet duct to the compressor inlet elbow.
    2. Tighten the hose clamp.

      Torque: 4.0 N*m (41 kgf*cm, 35 in.*lbf) 

    3. Install the bolt.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

    4. Attach the 2 clamps and connect the vacuum hose.
  48. CONNECT NO. 2 PCV TUBE 

    Refer to PROCEDURE - Step 19 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 19 [09/2018 - ]

  49. INSTALL NO. 1 AIR HOSE 
    1. Install the No. 1 air hose to the No. 1 compressor outlet elbow.
    2. Tighten the hose clamp.

      Torque: 6.3 N*m (64 kgf*cm, 56 in.*lbf) 

  50. INSTALL NO. 1 AIR INLET DUCT 
    1. Connect the No. 1 air inlet duct to the compressor inlet elbow.
    2. Tighten the hose clamp.

      Torque: 4.0 N*m (41 kgf*cm, 35 in.*lbf) 

    3. Install the bolt.

      Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf) 

    4. Attach the 2 clamps and connect the vacuum hose.
  51. CONNECT NO. 1 PCV TUBE 

    Refer to PROCEDURE - Step 20 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 20 [09/2018 - ]

  52. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE 

    Refer to PROCEDURE - Step 23 [12/2017 - 09/2018] , or refer to PROCEDURE - Step 23 [09/2018 - ]

  53. INSTALL FUEL PUMP ASSEMBLY (for Bank 2) 

    Refer to INSTALLATION [12/2017 - 10/2020]

  54. INSTALL FUEL PUMP ASSEMBLY (for Bank 1) 

    Refer to INSTALLATION [12/2017 - 10/2020]

  55. INSTALL GENERATOR ASSEMBLY 

    Refer to INSTALLATION [12/2017 - 10/2020]

  56. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY