Installation [01/2017 - 05/2023]: Procedure
- INSTALL BACKUP RELAY
- Attach the claw and install the backup relay to the relay block assembly.
- Connect the connector to the backup relay.
- Install the backup relay to the relay block assembly with the 2 bolts.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Install the bolt and nut to the backup relay terminal.
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- Attach the 3 claws and connect the relay block assembly to the No. 1 luggage room relay block (No. 1 luggage room relay block left side).
- Attach the 7 claws and install the relay block lower cover to the No. 1 luggage room relay block (No. 1 luggage room relay block right side).
- INSTALL NO. 1 LUGGAGE ROOM RELAY BLOCK
- Attach the 2 clamps and connect the No. 1 luggage room relay harness to the luggage room panel.
- w/o Dynamic Rear Steering:
Connect the No. 1 luggage room relay block with the 2 bolts and nut.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- w/ Dynamic Rear Steering:
- Install the relay block cover.
- Connect the positive (+) sub-battery terminal to the sub-battery module assembly with the nut.
Torque: 8.7 N*m (89 kgf*cm, 77 in.*lbf)
- INSTALL NO. 1 DECK BOARD BRACKET RH
- Install the No. 1 deck board bracket RH with the bolt and nut.
Torque: 15.8 N*m (161 kgf*cm, 12 ft.*lbf)
- Install the No. 1 deck board bracket RH with the bolt and nut.
- INSTALL CONNECTOR COVER
See step 3
- INSTALL NO. 2 DECK BOARD BRACKET
Refer to INSTALLATION [01/2017 - 05/2023]
- INSTALL INNER LUGGAGE COMPARTMENT TRIM COVER RH
Refer to PROCEDURE - Step 5 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 5 [01/2021 - 05/2023]
- INSTALL FRONT LUGGAGE COMPARTMENT TRIM COVER
Refer to PROCEDURE - Step 6 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 6 [01/2021 - 05/2023]
- INSTALL NO. 1 LUGGAGE COMPARTMENT LIGHT ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL LUGGAGE COMPARTMENT TRIM BOX
Refer to PROCEDURE - Step 8 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 8 [01/2021 - 05/2023]
- INSTALL REAR FLOOR FINISH PLATE
Refer to PROCEDURE - Step 9 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 9 [01/2021 - 05/2023]
- INSTALL SIDE TRIM BOX
Refer to PROCEDURE - Step 10 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 10 [01/2021 - 05/2023]
- INSTALL LUGGAGE COMPARTMENT TRIM COVER LH
Refer to PROCEDURE - Step 11 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 11 [01/2021 - 05/2023]
- INSTALL LUGGAGE COMPARTMENT TRIM COVER RH
Refer to PROCEDURE - Step 12 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 12 [01/2021 - 05/2023]
- INSTALL NO. 1 DECK BOARD
Refer to PROCEDURE - Step 14 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 14 [01/2021 - 05/2023]
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- INSTALL NO. 2 DECK BOARD
Refer to PROCEDURE - Step 13 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 13 [01/2021 - 05/2023]