Installation [10/2015 - ]: Procedure
- INSTALL SCAVENGING PUMP ASSEMBLY
See step 1
- INSTALL NO. 3 OIL PIPE
See step 2
- INSTALL NO. 2 OIL PIPE
See step 3
- INSTALL NO. 1 OIL PIPE
See step 4
- INSTALL INLET WATER PIPE
Refer to PROCEDURE - Step 49
- INSTALL TIMING GEAR CASE OR TIMING CHAIN CASE OIL SEAL
- Apply MP grease to the lip of a new timing chain case or timing chain case oil seal.
- Using SST and a hammer, tap in the timing chain case or timing chain case oil seal until its surface is flush with the timing chain cover assembly edge.
*a Standard Depth - SST: 09506-3501009223-22010
Standard Depth
-0.5 to 0.5 mm (-0.0197 to 0.0197 in.) (From the edge of the timing chain cover assembly)
NOTE:- Keep the lip free from foreign matter.
- Do not tap in the timing chain case or timing chain case oil seal at an angle.
- Do not tap in the oil seal excessively.
- INSTALL TIMING CHAIN COVER ASSEMBLY
- Remove any old packing remaining on the sealing surfaces before applying seal packing.
- Clean the contact surfaces of the timing chain cover assembly, cylinder head sub-assembly, cylinder head LH and cylinder block sub-assembly and confirm that there is no oil, moisture or other foreign matter on the surfaces.
Area to be Cleaned and Degreased - - - Install a new oil pump gasket.
- Install a new O-ring.
- Apply seal packing in a continuous line to the timing chain cover assembly as shown in the illustration.
*a 20 mm (0.787 in.) *b 26 mm (1.02 in.) *c 16 mm (0.630 in.) *d 18 mm (0.709 in.) *e 23 mm (0.906 in.) *f 0.5 mm (0.0197 in.) *g Continuous Line Area *h Dashed Line Area *i Diagonal Line Area - - Seal Packing
Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
SEAL PACKING APPLICATION CHARTArea Seal Packing Diameter Application Position from Inside Edge of Cover Continuous Line Area 2.5 to 3.5 mm (0.0984 to 0.138 in.) 2.5 mm (0.0984 in.) Dashed Line Area 6.4 mm (0.252 in.) or more 0.5 mm (0.0197 in.) Diagonal Line Area 2.5 to 3.5 mm (0.0984 to 0.138 in.) 5.5 mm (0.217 in.) NOTE:- If there is oil on the contact surfaces, wipe them with an oil-free cloth before applying seal packing.
- Install the timing chain cover assembly within 3 minutes and tighten the bolts within 10 minutes of applying seal packing.
- Do not add engine oil for at least 2 hours after installing the timing chain cover assembly.
- Do not start the engine for at least 2 hours after installing the timing chain cover assembly.
- Align the oil pump drive rotor spline and the crankshaft as shown in the illustration, and install the timing chain cover assembly.
*1 Crankshaft *a Oil Pump Drive Rotor Spline - Temporarily install the timing chain cover assembly with the 30 bolts and nut.BOLT LENGTH:
Item Length Thread Diameter Bolt (A) 25 mm (0.984 in.) 8 mm (0.315 in.) Bolt (B) 55 mm (2.17 in.) 8 mm (0.315 in.) Bolt (C) 70 mm (2.76 in.) 8 mm (0.315 in.) Bolt (D) 35 mm (1.38 in.) 10 mm (0.394 in.) Bolt (E) 80 mm (3.15 in.) 10 mm (0.394 in.) Bolt (F) 80 mm (3.15 in.) 10 mm (0.394 in.) Bolt (G) 80 mm (3.15 in.) 8 mm (0.315 in.) *a Nut NOTE:Make sure that there is no oil on the bolt threads.
- Tighten the 11 bolts in several steps in the order shown in the illustration.
Torque: 47 N*m (479 kgf*cm, 35 ft.*lbf)
- Temporarily install the V-ribbed belt tensioner assembly with the bolt and hexagon bolt.
*a Hexagon Bolt - Tighten the 21 bolts and nut in several steps in the order shown in the illustration.
Torque: 23 N*m (235 kgf*cm, 17 ft.*lbf)
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
*a Nut - If the seal packing has seeped out at the areas (A) shown in the illustration, wipe it off.
- INSTALL CAMSHAFT TIMING CONTROL MOTOR WITH EDU ASSEMBLY RH
Refer to PROCEDURE - Step 1
- INSTALL CAMSHAFT TIMING CONTROL MOTOR WITH EDU ASSEMBLY LH
Refer to PROCEDURE - Step 7
- INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
Refer to PROCEDURE - Step 53
- INSTALL SPARK PLUG TUBE GASKET
Refer to PROCEDURE - Step 56
- INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH
Refer to PROCEDURE - Step 57
- INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 58
- INSTALL CRANKSHAFT TIMING GEAR KEY
Refer to PROCEDURE - Step 27
- INSTALL CRANKSHAFT PULLEY
Refer to PROCEDURE - Step 3
- INSTALL OIL FILTER BRACKET SUB-ASSEMBLY
- Install 2 new gaskets to the oil filter bracket sub-assembly.
- Install the oil filter bracket sub-assembly with the 2 bolts and 2 nuts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Install the oil filter bracket stay with the 2 bolts.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- INSTALL FRONT WATER BY-PASS JOINT
Refer to PROCEDURE - Step 66
- INSTALL NO. 3 V-BANK COVER BRACKET SUB-ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL NO. 4 V-BANK COVER BRACKET SUB-ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL IGNITION COIL ASSEMBLY
Refer to PROCEDURE - Step 2
- INSTALL NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY
Refer to PROCEDURE - Step 6
- INSTALL WATER INLET HOUSING
Refer to PROCEDURE - Step 10
- INSTALL WATER PUMP PULLEY
Refer to PROCEDURE - Step 2
- INSTALL OIL PUMP DRIVE SHAFT PULLEY
Refer to PROCEDURE - Step 12
- INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
Refer to PROCEDURE - Step 13
- INSTALL GENERATOR ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL COMPRESSOR WITH PULLEY ASSEMBLY
Refer to PROCEDURE - Step 2
- CONNECT SUCTION HOSE
Refer to PROCEDURE - Step 3
- CONNECT NO. 1 COOLER REFRIGERANT DISCHARGE HOSE
Refer to PROCEDURE - Step 4
- INSTALL FRONT STABILIZER BAR
Refer to PROCEDURE - Step 5
- INSTALL FRONT NO. 1 STABILIZER BRACKET LH
Refer to PROCEDURE - Step 5 [10/2015 - 05/2018], or Refer to PROCEDURE - Step 5 [05/2018 - ]
- INSTALL FRONT NO. 1 STABILIZER BRACKET RH
HINT:
Use the same procedure as for the LH side.
- INSTALL REAR ENGINE UNDER COVER LH
Refer to PROCEDURE - Step 72 [10/2015 - 05/2018], or Refer to PROCEDURE - Step 73 [05/2018 - ]
- INSTALL REAR ENGINE UNDER COVER RH
HINT:
Use the same procedure as for the LH side.
- INSTALL FAN AND GENERATOR V BELT
Refer to PROCEDURE - Step 1
- INSTALL FUEL PUMP WITH SEAL SUB-ASSEMBLY (for Bank 1)
Refer to INSTALLATION [10/2015 - 05/2018] , or Refer to INSTALLATION [05/2018 - ]
- INSTALL FUEL PUMP WITH SEAL SUB-ASSEMBLY (for Bank 2)
Refer to PROCEDURE - Step 6 [10/2015 - 05/2018], or Refer to PROCEDURE - Step 6 [05/2018 - ]
- INSTALL BATTERY TRAY
Refer to PROCEDURE - Step 6
- INSTALL POWER STEERING ECU ASSEMBLY
Refer to INSTALLATION [10/2015 - ]
- ENGAGE ENGINE WIRE
Refer to PROCEDURE - Step 17
- INSTALL ENGINE ROOM ECU COVER
Refer to PROCEDURE - Step 5
- CONNECT NO. 2 RADIATOR HOSE
Refer to PROCEDURE - Step 58 [10/2015 - 05/2018], or Refer to PROCEDURE - Step 58 [05/2018 - ]
- CONNECT NO. 1 RADIATOR HOSE
Refer to PROCEDURE - Step 59 [10/2015 - 05/2018], or Refer to PROCEDURE - Step 59 [05/2018 - ]
- INSTALL RADIATOR RESERVE TANK ASSEMBLY
Refer to PROCEDURE - Step 11
- INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Refer to PROCEDURE - Step 61 [10/2015 - 05/2018], or Refer to PROCEDURE - Step 61 [05/2018 - ]
- INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
Refer to PROCEDURE - Step 1
- INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE
Refer to PROCEDURE - Step 2
- CONNECT VENTILATION HOSE
Refer to PROCEDURE - Step 3
- INSTALL INLET NO. 1 AIR CLEANER
Refer to PROCEDURE - Step 16
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [10/2015 - 09/2016] , or Refer to INITIALIZATION [09/2016 - 09/2017] , or Refer to INITIALIZATION [09/2017 - ]
- ADD ENGINE OIL
Refer to PROCEDURE - Step 5
- ADD ENGINE COOLANT
Refer to PROCEDURE - Step 5
- ADD AUTOMATIC TRANSMISSION FLUID
Refer to ADJUSTMENT [10/2015 - ]
- CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
Refer to PROCEDURE - Step 2
- WARM UP ENGINE
Refer to PROCEDURE - Step 3
- INSPECT FOR COOLANT LEAK
Refer to PROCEDURE - Step 1
- INSPECT FOR ENGINE OIL LEAK
Refer to PROCEDURE - Step 7
- INSPECT FOR FUEL LEAK
Refer to PROCEDURE - Step 1
- INSPECT FOR EXHAUST GAS LEAK
Refer to PROCEDURE - Step 9
- INSPECT FOR REFRIGERANT LEAK
Refer to PROCEDURE - Step 4
- CHECK ENGINE OIL LEVEL
Refer to PROCEDURE - Step 1
- PERFORM INITIALIZATION
Refer to INITIALIZATION [10/2015 - 09/2016] , or Refer to INITIALIZATION [09/2016 - 09/2017] , or Refer to INITIALIZATION [09/2017 - ]
- INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
Refer to PROCEDURE - Step 96 [10/2015 - 05/2018], or Refer to PROCEDURE - Step 97 [05/2018 - ]
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 2 [10/2015 - 09/2017], or Refer to PROCEDURE - Step 2 [09/2017 - ]
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 98 [10/2015 - 05/2018], or Refer to PROCEDURE - Step 99 [05/2018 - ]