LEMON Manuals: Even more car manuals for everyone

Inspection Procedure

WARNING: This page is about a different car, the 2007 Lexus SC 430. However, it is still accessible from the selected car via links, so may be relevant.
  1. READ VALUE OF INTELLIGENT TESTER (ROOF LOCK) 
    1. Check the DATA LIST for proper functioning of the roof lock.

      Sliding roof control ECU 

      ITEM DIAGNOSTIC NOTE

      Item Measurement Item/ Display (Range) Normal Condition Diagnostic Note
      ROOF LOCK SW Roof lock signal/ ON or OFF ON: Roof is locked
      OFF: Roof is unlocked
      -

      OK: 

      On tester screen, each item changes between ON and OFF according to above chart. 

    OK: REPLACE SLIDING ROOF CONTROL ECU 

    NG: Go to next step 

  2. INSPECT SLIDE ROOF RAIL ASSEMBLY 
    Fig 1: Inspecting Slide Roof Rail Assembly
    G05294097Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Remove the slide roof limit switch (see REMOVAL  ).
    2. Measure the resistance of the switch.

      Standard resistance 

      TESTER CONNECTION SPECIFIED CONDITION CHART

      Tester Connection Switch Condition Specified Condition
      1 - 2 Pushed Below 1 Ω
      1 - 2 Not pushed 10 kΩ or higher

    NG: REPLACE SLIDE ROOF LIMIT SWITCH (ROOF LOCK) 

    OK: Go to next step 

  3. CHECK WIRE HARNESS (ECU - SLIDE ROOF LIMIT SWITCH (ROOF LOCK)) 
    Fig 2: Checking Wire Harness (ECU - Slide Roof Limit Switch (Roof Lock))
    G05294098Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Disconnect the S17 ECU connector.
    2. Disconnect the L10 switch connector.
    3. Measure the resistance of the wire harness side connectors.

      Standard resistance 

      TESTER CONNECTION SPECIFIED CONDITION CHART

      Tester Connection Specified Condition
      S17-6 (RLL) - L10-1 Below 1 Ω
      S17-17 (RLLE) - L10-2 Below 1 Ω
      S17-6 (RLL) - S17-17 (RLLE) 10 kΩ or higher
      S17-6 (RLL) - Body ground 10 kΩ or higher
      S17-17 (RLLE) - Body ground 10 kΩ or higher

    NG: REPAIR OR REPLACE HARNESS AND CONNECTOR 

    OK: Go to next step 

  4. INSPECT REMOVABLE ROOF LOCK SUB-ASSEMBLY 
    Fig 3: Inspecting Removable Roof Lock Sub-Assembly
    G05294099Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Disconnect the roof lock motor connector (see REMOVAL  ).
    2. Apply battery voltage to the lock terminals and check operation of the removable roof lock.

      OK 

      MEASUREMENT CONDITION CHART

      Measurement Condition Specified Condition
      Battery positive (+) → Terminal 1
      Battery negative (-) → Terminal 2
      Hook moves to LOCK position
      Battery positive (+) → Terminal 2
      Battery negative (-) → Terminal 1
      Hook moves to UNLOCK position

    NG: REPLACE REMOVABLE ROOF LOCK SUB-ASSEMBLY 

    OK: Go to next step 

  5. CHECK SLIDE ROOF LIMIT SWITCH OPERATION (ROOF LOCK) 
    1. Disconnect the roof lock motor connector.
    2. Disconnect the L10 switch connector.
    3. Connect the battery's positive (+) lead to terminal 1 and the negative (-) lead to terminal 2.
    4. Measure the resistance of the switch.

      Standard resistance 

      TESTER CONNECTION SPECIFIED CONDITION CHART

      Tester Connection Switch Condition Specified Condition
      1 - 2 Locked Below 1 Ω
    5. Reverse the polarity.
    6. Measure the resistance of the switch.
      Fig 4: Checking Slide Roof Limit Switch Operation (Roof Lock)
      G05294100Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard resistance 

      TESTER CONNECTION SPECIFIED CONDITION CHART

      Tester Connection Switch Condition Specified Condition
      1 - 2 Unlocked 10 kΩ or higher

    NG: REPLACE SWITCH BEZEL 

    OK: REPLACE SLIDING ROOF CONTROL ECU