Test No. 20 - Sun Roof Ecu Communication Problem: Testing
- Check operation of sun roof. If operation is okay, go to next step. If sun roof does not operate, replace sun roof ECU.
- Disconnect 10-pin connector M5 from sun roof ECU. Disconnect 25-pin connector B5 from body No. 1 ECU. Check continuity of Orange wire between body No. 1 ECU connector B5 terminal No. 9 and sun roof ECU connector M5 terminal No. 2. See Figure and Fig 1. See WIRING DIAGRAMS. If continuity exists, replace sun roof ECU. If continuity does not exist, repair wiring as necessary.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002