Removal And Installation
- Disconnect the battery negative terminal.
- Remove the engine cover.
(Refer to Engine and Transaxle Assembly - "ENGINE COVER ")
- Remove the engine room under cover.
(Refer to Engine and Transaxle Assembly - "ENGINE ROOM UNDER COVER ")
- Drain the engine coolant.
(Refer to Cooling System - "COOLANT ")
- Remove the exhaust manifold.
(Refer to Intake and Exhaust System - "EXHAUST MANIFOLD ")
- Disconnect the EGR cooler inlet & outlet hose (A).
- Remove the EGR cooler pipe B (A).
Tightening torque:
18.6-23.5 N.m (1.9-2.4 kgf.m, 13.7-17.4 lb.ft)
- Remove the EGR cooler (A).
Tightening torque:
18.6-23.5 N.m (1.9-2.4 kgf.m, 13.7-17.4 lb.ft)
- Install in the reverse order of removal.
- Fill with engine coolant.
(Refer to Cooling System - "COOLANT ")
NOTE: The coolant must be injected according to the integrated thermal management module (ITM) coolant filling method.