LEMON Manuals: Even more car manuals for everyone

Signal Circuit Inspection

  1. Check for open in signal circuit.
    1. Ignition "OFF".
    2. Disconnect PCM connector.
    3. Measure resistance between terminals 1 of the FTPS harness connector and 33 of the PCM harness connector.

      Specification : Approx. 0Ω

    4. Is resistance within the specification?

    YES 

    • Go to next step as below.

    NO 

  2. Check for short to ground in signal circuit
    1. Measure resistance between terminal 1 of the FTPS harness connector and chassis ground

      Specification infinite

    2. Is resistance within the specification?

      YES 

      • Go to next step as below.

      NO