Valve Clearance (Impulse)
NOTE:
Impulse is equipped with 16-valve DOHC engine. Follow adjustment procedures carefully.
- Disconnect negative battery. Remove rocker cover. Remove spark plugs. Rotate engine until "0" degrees mark on timing belt cover aligns with crankshaft pulley timing mark groove.
- Ensure cylinder No. 1 is at TDC of compression stroke by removing distributor cap. Rotor should point at No. 1 cylinder spark plug wire terminal. If rotor is not pointing as indicated, rotate crankshaft one revolution (360 degrees) and realign timing marks.
- Measure and record intake valve clearance of cylinders No. 1 and 2, and exhaust valve clearance of cylinders No. 1 and 3. Rotate crankshaft one complete revolution (360 degrees), realigning timing marks. Measure and record intake valve clearance of cylinders No. 3 and 4, and exhaust valve clearance of cylinders No. 2 and 4.NOTE: Both camshaft rear bearing caps must be removed to access adjusting shim in lifter recess.
- To adjust valve clearance and replace adjusting shim. Turn camshaft lobe downward on valve to be adjusted. Insert Valve Lash Spring Spacer (J-38413-2 left or J-38413-3 right) between camshaft journal and camshaft lobe next to shim. Turn camshaft lobe upward. Using screwdriver and magnet, remove adjusting shim from lifter recess.
- Calculate shim thickness using shim thickness selection charts. The following formula will also calculate shim thickness: N = T + A
N = Thickness of shim required.
T = Thickness of shim removed.
A = Valve clearance measured minus valve clearance specs.
- Replace removed adjusting shim with another shim that will allow the required valve clearance. See table. Repeat procedure as required.