Removal And Installation
- Disconnect the battery negative terminal.
Tightening Torque
(-) terminal:
4.0 - 6.0 N.m (0.4 - 0.6 kgf.m, 3.0 - 4.4 lb-ft)
- Remove the Air Duct and Air Cleaner Assembly. (Refer to AIR CLEANER procedure).
- Disconnect the starter cable (B) from the B terminal on the solenoid then disconnect the connector (A) from the S terminal.
- Remove the 2 bolts holding the starter, then remove the starter (A).
Tightening Torque:
42.2 - 53.9 N.m (4.3 - 5.5 kgf.m, 31.1 - 39.8 lb-ft)
- Installation is the reverse of removal.
- Connect the battery negative terminal last.