LEMON Manuals: Even more car manuals for everyone

Repair Procedures: Inspection

WARNING: This page is about a different variant/trim than selected.
  1. Connect the GDS on the Data Link Connector (DLC).
  2. Measure the output voltage and fuel pressure of the RPS at idle and various engine speed.
    Pressure Output Voltage (V) [Vref=5V]
    bar [MPa (kgf/cm2 , psi)]
    0 0 (0, 0) 0.5
    140 14 (142, 2031) 2.5
    280 28 (286, 4061) 4.5
    Fig 1: Screen Display - Rail Pressure Sensor Signal Waveform
    G12055427Courtesy of HYUNDAI MOTOR AMERICA