LEMON Manuals: Even more car manuals for everyone

Power Circuit Inspection

■ Back-Up Voltage Inspection 

  1. IG "OFF". Disconnect PCM connector.
  2. IG "ON".
  3. Measure voltage between terminal 6 of the PCM harness connector and chassis ground.

    Specification:  Remain stable at battery voltage

  4. Are circuits remaining stable at battery voltage?

    YES 

    • Using a GDS, check PCM software version and upgrade as necessary. If version is the newest one, check PCM for contamination, deterioration, or damage. Substitute with a known-good PCM and check for proper operation. If the problem is corrected, replace PCM and then go to "VERIFICATION OF VEHICLE REPAIR " procedure.
      NOTE: It is necessary to perform the TPS adaptation procedure with GDS when the throttle body assembly or PCM is replaced.

      ■ TPS adaptation procedure

      1. Erase previous TPS adaptation value using GDS.
      2. Ignition ""OFF"" and then ""ON"" without cranking. Wait for 10 seconds under enable conditions-Enable conditions: Battery >10V & Intake Air Temp. >5.3°C(41.5°F) & 5.3°C(41.5°F)< Engine Coolant Temp.<99.8°C(211.6°F)
      3. After TPS adaptation, the system normality should be confirmed by reading out ""FMY"" on the Scan Tool."

    NO 

    • If voltage fluctuates, check circuit for loose, bent or corroded terminals, Repair as necessary and go to "VERIFICATION OF VEHICLE REPAIR " procedure.