LEMON Manuals: Even more car manuals for everyone

Signal Circuit Inspection

  1. IG "OFF" & Disconnect HO2S(S2) connector.
  2. IG "ON" & ENG "OFF".
  3. Measure the voltage between signal terminal of HO2S(S2) harness connector and chassis ground.

    Specification:  Approx. 0.45V.

  4. Is the measured voltage within specification?

    YES 

    • Go to "COMPONENT INSPECTION  " procedure

    NO